Alstom
Frommi
ALSTOM wins another order for its innovative Air Pollution Control Equipment in Denmark
30 January 2006
ALSTOM has been awarded a contract by Energi E2 to supply its innovative flue gas desulphurisation technology, FLOWPAC, and a Selective Catalytic Reduction (SCR) system to the Amager Power Plant, located near the Danish capital, Copenhagen.
The FLOWPAC flue gas desulphurisation plant and SCR system will be installed to remove sulphur dioxide and nitrogen oxides on a 150 MW coal-fired boiler also designed to burn fuel oil and straw. The FLOWPAC will ensure a removal efficiency of over 97% of sulphur dioxide.
FLOWPAC, ALSTOM’s innovative turbulent bed, limestone forced-oxidation wet flue gas desulphurisation technology offers significant advantages over the conventional WFGD absorber technology. For difficult applications, such as fuels with high or varying sulphur content and strict emission requirements, it represents a breakthrough in performance and flexibility, but also in investment, operation and maintenance costs. FLOWPAC additionally offers higher removal of sulphur trioxide and particulate matter.
This is the second order ALSTOM has recently won for its innovative FLOWPAC technology, following the contract awarded by Lietuvos Elektrine for the supply of five FLOWPACs for its Elektrenai Power Plant in Lithuania.
***
ALSTOM sets the benchmark for innovative, environmentally friendly technologies in the world of power and rail transport infrastructure. ALSTOM built the fastest train and the highest capacity automated metro in the world, and provides turnkey integrated power plant solutions and associated services for a wide variety of energy sources, including hydro, gas and coal. The Group employs 69,000 people in 70 countries, and had sales of €15.8 billion in 2004/05.
Press Releases Print Send
ALSTOM awarded 310MW GT13E2 Combined Cycle Power Plant project in Australia
30 January 2006
ALSTOM has been awarded an EPC contract to supply a turnkey 310MW GT13E2 gas-turbine-based combined cycle power plant at Kwinana, south of Perth, Western Australia. The order has been placed by independent power producer New Gen Power Ltd, a specialist gas-fired generation company owned by ERM Power and Babcock & Brown.
ALSTOM will design, supply, install and commission the entire power plant consisting of 1 x GT13E2 gas turbine, 1 x 160MW steam turbine, condenser, HRSG, step up transformers, plant control systems, HV switchyard, civil works and balance of plant.
The site for the new plant is located adjacent to the 240MW combined cycle Cockburn power station, built and commissioned by ALSTOM in 2003 and, like Cockburn, the new plant will be used to generate base load power.
Construction of the plant will begin with site preparation in early 2006 and commercial operation expected in late 2008. When complete, the plant will assist with meeting the ever increasing electricity demands of Western Australia and assist Western Power, the state owned utility and major electricity retailer, to manage its increasing base load energy requirements.
This order follows a contract won by ALSTOM for three of the same units in April last year for the Braemar Power Project in Queensland. The GT13E2 fleet has now accumulated more than 2,600,000 operating hours.
ALSTOM’s Australian and New Zealand Country president, Chris Raine, said: “We are delighted to have been selected for repeat business with New Gen Power and to be involved again in the further development of the expanding West Australian power industry. The project reinforces ALSTOM’s significant local presence and experience in the supply of turnkey plant and, together with our ongoing Power Service activities, underscores our leading position as a technology and plant supplier to the power generation industry in Australia. ALSTOM is committed to Australia’s growing energy market and expects to participate in future projects required to meet the increasing demand for electricity throughout the country.”
***
ALSTOM sets the benchmark for innovative, environmentally friendly technologies in the world of power and rail transport infrastructure. ALSTOM built the fastest train and the highest capacity automated metro in the world, and provides turnkey integrated power plant solutions and associated services for a wide variety of energy sources, including hydro, gas and coal. The Group employs 69,000 people in 70 countries, and had sales of €15.8 billion in 2004/05.
Alstom Projects India has posted 10.29% rise in net profit at Rs75mn for the third quarter ended December 2005 as compared with Rs68mn for the corresponding period of the last financial year.
Its total income has increased 53.32% at Rs2.93bn for the quarter from Rs1.91bn in the year-ago period, the company said. The company is in the business of designing, building and servicing technologically advanced products and systems for the world’s energy and transport infrastructure
Bei der angehängten Grafik :
Bedeutender Rückstand zur Konkurenz
rot : die Alstom Aktie in Paris
Schwarz : die Siemens Aktie in Frankfurt
blau : die ABB Aktie in Zürich
und ausserdem ist 2008 zum Glück noch ein Weilchen hin Puh 821% sind ja doch ein ganzer Batzen!!)
ALSTOM wins orders worth 200 million euros at Dubai aluminium smelter
06 February 2006
ALSTOM has won orders worth around €200 million with Dubai Aluminium Company Limited (DUBAL) for the turnkey construction of a 430 MW gas-fired combined-cycle power plant and the supply of fume treatment systems for an aluminium smelter in Dubai, United Arab Emirates.
The contracts were signed yesterday by ALSTOM Chairman and CEO Patrick Kron, Mohamed Al-Gureir DUBAL Managing Director and Abdullah Kalman DUBAL CEO, at an official ceremony held in Dubai.DUBAL is extending two of its nine aluminium smelting potlines at its plant, located in the south of the Emirate, and consequently needs more power for the production process.
ALSTOM will carry out the engineering, supply, building and commissioning of the new power plant, including the supply of two ALSTOM’s GT13E2 gas turbines, three generators, steam turbine, heat recovery steam generator, digital control system and balance of plant.
ALSTOM will also supply two fume treatment centres for the extension of the two potlines which will significantly decrease the fluoride and particulate emissions produced in the aluminium production process.
The power plant will begin delivering power as early as January 2007 with project completion scheduled for December 2007.
Philippe Joubert, President of ALSTOM’s Power Turbo-Systems/Power Environment Sector, said: “The GT13E2 is proving itself to be the flexible, powerful solution required for power production for aluminium smelting. We are strong players in the aluminium market because of two factors: this technology and our plant integrator capability. This contract represents a significant development in the business relationship between our two companies.”
********
ALSTOM has, over the past three years, won several contracts to build turnkey power plants for the three aluminium producers in the Middle East, namely Aluminium Bahrain, Sohar Aluminium Company and DUBAL.
In 2003, ALSTOM won a contract with Aluminium Bahrain (ALBA) for a 650 MW 2X GT13 gas-fired combined cycle power station as part of an expansion project for its aluminium smelter plant. This followed two earlier contracts in 1990 and 1995 for two gas-fired power stations. In 2005, ALSTOM won a repeat gas turbine upgrade order for its gas-fired, combined-cycle power plant at Manama, Bahrain
In 2004, ALSTOM won a contract with Dubai Aluminium (DUBAL) to upgrade and extend an existing gas-fired power station to cater for an increase in aluminium.
At the end of 2005, ALSTOM won a contract from Sohar Aluminium Company for the turnkey construction and long-term maintenance of a 1000 MW 4X GT13 gas-fired combined cycle power plant in Oman.
ALSTOM is also a world leader in environmental control systems and has supplied several fume treatment systems to control emissions from aluminium smelters owned by ALBA and DUBAL.
ALSTOM also won a contract in 2005 in Argentina with aluminium producer Aluar for the turnkey construction of a 465 MW 2X GT13 gas-fired combined cycle power station.
Press relations: G. Tourvieille
(Tel. +33 1 41 49 27 13 )
press@chq.alstom.com
Investor relations: E. Châtelain
(Tel. +33 1 41 49 37 38)
Investor.relations@chq.alstom.com
Frommi
Handelsblatt 6.2.06
Bisher baute die Branche vor allem für das Ausland. Jetzt zieht der Heimatmarkt wieder an.
JÜRGEN FLAUGER W. GILLMANN | DÜSSELDORF Die deutschen Kraftwerksbauer stellen sich auf einen Auftragsboom im Inland ein. Bisher lief lediglich das Auslandsgeschäft gut. Jetzt erwarten die deutschen Hersteller auch für den Heimatmarkt zweistellige Zuwachsraten beim Auftragseingang. "Langsam scheint sich der Investitionsstau im Kraftwerksmarkt in Deutschland aufzulösen", sagte der Vorsitzende der Gas- und Dampfturbinenhersteller im Fachverband VDMA und Siemens-Manager, Frank Stieler.
Nach Angaben des Verbands der deutschen Elektrizitätswirtschaft (VDEW) sind bereits 24 größere Kraftwerke mit einer Gesamtleistung von 18 000 Megawatt im Bau oder in Planung. Sie sollen bis 2011 in Betrieb gehen. Bis 2020 wird die neue Kapazität nach Einschätzung von Analysten auf 40 000 Megawatt klettern. Dies entspricht einem Auftragsvolumen von rund 40 Mrd. Euro. Insgesamt sind derzeit in Deutschland Kraftwerke mit einer Gesamtkapazität von rund 130 000 Megawatt in Betrieb.
Wegen des geplanten Atomausstiegs steht hinter diesen Prognosen allerdings ein Fragezeichen. Sollte der Atomkonsens korrigiert werden und dürfen die Versorger ihre Kernkraftwerke länger am Netz lassen, würden sich wohl einige Neubauprojekte verzögern, glauben Experten. Kurzfristig dürfte sich an den Planungen aber nichts ändern.
Bei den Branchengrößen Eon, RWE, Vattenfall Europe und Energie Baden-Württemberg heißt es, ihre avisierten Projekte würden von der Frage des Kernenergieausstiegs nicht beeinflusst. Die Aussichten steigen damit, dass der Boom bei den Kraftwerksbauern und ihren Zulieferern auch das Inlandsgeschäft erfasst. Der weltweite Umsatz der Branche stieg im vergangenen Jahr im Vergleich zu 2004 um 13,2 Prozent auf 13,7 Mrd. Euro. In Deutschland fiel er dagegen noch um 5,5 Prozent auf 1,7 Mrd. Euro. Vor allem der chinesische Markt wächst rasant, aber auch die Staaten der Golfregion und Indien bestellen viele Kraftwerke. Die Industrialisierung und die wachsende Bevölkerung in vielen Schwellenländern lassen die Nachfrage nach zusätzlicher Kraftwerksleistung sowie nach Gas- und Dampfturbinen für die Industrie steigen.
Ein rasanter Auftragsboom im Inland könnte deshalb zu Produktionsengpässen führen. "Dann reichen die Kapazitäten nicht", sagt VDMA-Geschäftsführer Thorsten Herdan. Nicht etwa fehlende Maschinen seien das Problem - es mangele an Ingenieuren und Facharbeitern. Allein Siemens sucht 450 Ingenieure für die Entwicklung neuer Turbinen und Kraftwerke. Der Personalmangel ist teilweise das Resultat des Stellenabbaus in schwächeren Jahren. Derzeit beschäftigt die Branche rund 18 000 Personen in Deutschland und 59 000 weltweit.
Der steigende Gaspreis hinterlässt allerdings auch Spuren in der Kraftwerksbranche. Die starke Nachfrage nach Gasturbinen wird wohl abflauen - Experten rechnen mit einem verstärkten Bau von Kohleanlagen in Europa. "Dafür sind Gaskraftwerke in China sehr gesucht, da sie billiger und schneller zu bauen sind", erläutert Herdan vom VDMA. Bei Siemens halten sich Aufträge für Gas- und Kohlekraftwerke in etwa die Waage, ergänzt Stieler von Siemens. Mit den dramatisch steigenden Strompreisen wird auch für Kommunalversorger der Bau von eigenen Kraftwerken lukrativ.
International konkurrieren die vier großen Anbieter Siemens, Alstom, General Electric und Mitsubishi um die großen Kraftwerksaufträge. Dazu kommt eine Vielzahl von Zulieferern. In Deutschland dominiert Siemens. Der Auftragseingang stieg im vergangenen Jahr von 700 Mill. auf 1,3 Mrd. Euro.
Allerdings ging der große Auftrag für das neue Braunkohlekraftwerk von RWE im rheinischen Neurath mit einer Gesamtinvestition von 2,2 Mrd. Euro an Alstom als Generalunternehmer. Die Franzosen sind dringend auf Erfolge angewiesen: Das Werk in Mannheim streicht gerade wegen Unterauslastung 700 Stellen.
Wenn du den Chart beobachtest, dann kannst du solche Phasen immer wieder erkennen. Das ist im Kursverlauf von Alstom Normalität und führte immer am Ende einer solchen Phase zu unerwarteten Panthersprüngen gen Norden. Jetzt gilt es eben auf der Lauer zu liegen und auf den nächsten Panthersprung zu warten.
mfg
bb
"Allerdings ging der große Auftrag für das neue Braunkohlekraftwerk von RWE im rheinischen Neurath mit einer Gesamtinvestition von 2,2 Mrd. Euro an Alstom als Generalunternehmer. Die Franzosen sind dringend auf Erfolge angewiesen: Das Werk in Mannheim streicht gerade wegen Unterauslastung 700 Stellen." HB 6.2.06
2,2 MRD Euro - das wäre ja ein dicker Brocken für Alstom. Hat man da von Seiten des Konzerns schon etwas gehört oder gelesen ? Wieso reagiert die Börse noch nicht ?
gleichbedeutend mit einem Auftrag, den ALSTOM als UNTERNEHMEN erhält.
Im ersten Fall (als GU) wirken mehrere Unternehmen als Subunternehmer an der
Abwicklung mit; entsprechend verteilt sich der Gewinn. Im zweiten Fall bleibt
der Gewinn dem Unternehmen ungeschmälert (das weißt Du bestimmt alles, aber
vielleicht ist es ja für einige andere interessant).
Trotzdem ist der Auftrag natürlich lukrativ für ALSTOM. Aber eben nicht so, daß
er den Kurs deutlich beeinflussen kann. Immerhin dürften schon jede Menge Er-
wartungen inzwischen eingepreist sein.
Ich bin schon zufrieden, wenn der Kurs nach guten Nachrichten nicht wegsackt.
Das zeigt mir, daß das Interesse ungebrochen ist, und daß für alle Anleger, die
Gewinne mitnehmen und aussteigen, andere nachrücken.
Dank u. beste Grüße
Frommi
Alles Gute
Frommi
O LA LA!! ;)
7,3% intraday. Wer jetzt noch glaubt, ALSTOM sei eine Dümpel-Tante, dürfte
kuriert sein. Und SL-Anhänger dürften heute keinen schönen Tag gehabt haben...
Abgesehen davon: von 59,- zurück auf 63,30, das ist schon ein Wort. Auf den
Nenner gebracht: die Aktie ist zur Zeit einfach nicht tot zu kriegen. Hoffen wir,
daß es noch eine Weile so bleibt.
Jep : Kanns du hier kuken ( mit 200 Average )
http://www.euronext.com/trader/chartsanalysis/...lectedChartDisplay=1
Tagen hinzugefügt und da sieht mann ja von wo der kommt .
Und bei Yahoo würd ich mich sofort beschwehren wenn der nicht stimmt !!
Seit der KE 2004 hat sich die Zahl der Aktien vervielfacht.