Monument Mining LTD. A0MSJF


Seite 161 von 197
Neuester Beitrag: 27.05.24 23:43
Eröffnet am:13.07.07 11:12von: RöttgenAnzahl Beiträge:5.906
Neuester Beitrag:27.05.24 23:43von: Kurt1989Leser gesamt:972.639
Forum:Hot-Stocks Leser heute:386
Bewertet mit:
33


 
Seite: < 1 | ... | 159 | 160 |
| 162 | 163 | ... 197  >  

3754 Postings, 5539 Tage tolksvarnews

 
  
    #4001
1
17.12.11 11:49
Monument Mining Limited announced that the company, through its wholly owned subsidiary Monument Mengapur Sdn Bhd, has received historic iron rich soil production information from the Mengapur Polymetallic Project property, located in the Pahang State in Malaysia approximately 17 kilometers north of Seri Jaya.

As previously disclosed, the company has entered into an agreement to acquire a 70% interest in the project, subject to, among other things, shareholder approval of the acquisition and related financing. Further details regarding this acquisition and financing can be found in the company's information circular disseminated in connection with the upcoming Annual and Special General Meeting at which these matters will be considered.

The company recently completed and on December 2nd 2011 filed the Snowden Mining Industry Consultants NI 43-101 report on the Mengapur Property. That report referred extensively to the historic information obtained from a Definitive Feasibility Study completed in 1993 by the former owner of the Project. In the course of its review of the DFS and conducting its due diligence on the Project the Company identified from records of Malaco that the project has also recently yielded important quantities of iron production from the iron rich soil overburden on the property.

From October 2010 to October 2011 during the Malaco ownership of the property, iron rich soil production totaling approximately 2,556,479 tonnes has been realized from the oxidized soils overlying the sulphide ore that consists of skarn rock. Rights to extract iron ore from these oxidized iron rich soils covering specific areas of the property are presently held by a Malaco appointed operator. This operation is extracting this material at a rate of up to 400,000 tonnes per month for beneficiation and shipment to China under a sales contract. Removal of some of these soils, which are overburden to the skarn rock sulfide ore, is necessary before the skarn can be accessed.

In the month of November 2011, an additional 214,052 tonnes was extracted and removed for shipping from Malaysia under a third party sales contract. The records of Malaco revealed to MMSB confirm the above tonnage has been removed from a selected and agreed portion of the Mengapur property.

A significant resource of Cu, Au, and Ag resides in the oxidized soils throughout the Mengapur deposit as presented in the NI 43-101 report and shown below in Table 1. The spatial distribution of the iron ores and the Cu Au Ag resource hosted within the oxidized soils is unknown at the present time as iron was not analyzed in the historic diamond drill holes completed by Malaysian Mining Corporation when it was preparing the DFS.

Historical Oxide Resource at a 0.336 Cu equivalent Cutoff grade (Snowden NI 43-101, December 2nd 2011)





Tonnes

EQV Cu (%)

Cu (%)

Au (g/t)

Ag (g/t)




Measured

4.866

0.419

0.47

0.05

27.82




Indicated

16.406

0.557

0.64

0.12

26.45




Subtotal

21.272

0.525

0.6

0.1

26.7  

204 Postings, 5120 Tage LegnanoMMY - Eisenerzproduktion auf Mengapur-Liegenschaft

 
  
    #4002
1
17.12.11 15:17
Monument Mining Limited - Pressemitteilungen - Monument erörtert Information über Eisenerzproduktion auf Mengapur-Liegenschaft - Sat Dec 17, 2011
"Vancouver, British Columbia, Kanada. 15. Dezember 2011. Monument Mining Limited (Frankfurt: WKN A0MSJR; TSX-V: MMY) ("Monument" oder das "Unternehmen") gibt bekannt, dass das Unternehmen durch seine sich vollständig in Unternehmensbesitz befindliche Tochtergesellschaft, Monument Mengapur Sdn. Bhd. ("MMSB"), Informationen über die historische Eisenproduktion aus den eisenhaltigen Böden auf der Liegenschaft des Polymetallprojekts Mengapur erhalten hat. Das Projekt liegt in Malaysia im Bundesstaat Pahang und ist 16 km von der Stadt Sri Jaya entfernt. Diese Information wird vorgelegt, um das Potenzial für eine kommerzielle Eisenproduktion aus den das Mengapur-Projekt überlagernden Bodenschichten zusätzlich zu dem Mineralpotenzial des unterlagernden Skarns zu demonstrieren. Wie bereits früher bekannt gegeben, hat das Unternehmen ein Abkommen zum Erwerb eines 70-%-Anteils an dem Projekt abgeschlossen, das unteranderem von der Zustimmung der Aktionäre zu der Akquisition und der damit verbundenen Finanzierung abhängig ist. Weitere Einzelheiten hinsichtlich dieser Akquisition und der Finanzierung sind im Informationsrundschreiben des Unternehmens zu finden, das in Verbindung mit der Jahreshaupt- und Sonderversammlung, auf der diese Punkte besprochen werden, verteilt wurde.

Das Unternehmen hat vor Kurzem von Snowden Mining Industry Consultants einen NI 43-101 konformen Bericht über die Mengapur-Liegenschaft erhalten und diesen am 2. Dezember 2011 eingereicht. Dieser Bericht bezog sich eingehend auf die historische Information, die von einer endgültigen Machbarkeitsstudie (Definitive Feasibility Study, "DFS") stammte, die im Jahre 1993 von dem früheren Besitzer des Projekts durchgeführt worden war. Im Laufe der Prüfung dieser DFS und basierend auf der eigenen Due Diligence (Prüfung mit gebührender Sorgfalt) auf dem Projekt identifizierte das Unternehmen aus Aufzeichnungen von Malaco, dass das Projekt ebenfalls eine beachtliche Eisenproduktion hatte, die von den eisenhaltigen Böden des Projekts stammte. 

Als das Projekt noch im Besitz von Malaco war, wurden in der Zeit von Oktober 2010 bis Oktober 2011 insgesamt ca. 2.556.479 Tonnen an eisenhaltigen Böden aus der Oxidationszone gewonnen, die das in Skarngestein beherbergte Sulfiderz überlagert. Die Rechte zur Gewinnung des Eisenerzes aus diesen oxidierten, eisenreichen Böden, die bestimmte Bereiche der Liegenschaft bedecken, sind gegenwärtig in Besitz eines von Malaco ernannten Betreibers. Laut Verkaufsvertrag gewinnt dieser Betrieb bis zu 400.000 Tonnen dieses Materials pro Monat zur Aufbereitung und Versand nach China. Die Abtragung eines Teils dieser Böden, die das im Skarn beherbergte Sulfiderz überlagern, ist notwendig, um den Skarn zu erreichen.

Im November 2011 wurden laut Vertrag mit einer dritten Partei weitere 214.052 Tonnen abgebaut und aufbereitet und aus Malaysia abtransportiert. Die Aufzeichnungen Malacos zeigten MMSB, dass die obige Menge in einem ausgewählten und festgelegten Bereich der Mengapur-Liegenschaft entfernt wurde.

Eine beachtliche Ressource an Cu, Au und Ag befindet sich in den oxidierten Böden der Mengapur-Lagerstätte, wie es im NI 43-101 konformen Bericht dargestellt und unten in Tabelle 1 gezeigt wird. Die räumliche Verteilung der innerhalb der oxidierten Böden beherbergten Eisenerze und der Cu-Au-Ag-Ressource ist zum gegenwärtigen Zeitpunkt unbekannt, da während der Anfertigung der DFS das Eisen in den historischen, von Malaysian Mining Corporation niedergebrachten Kernbohrungen nicht analysiert wurde. 

Tabelle 1. Historische Oxid-Ressource bei einem Cu-Äquivalent-Cutoff-gehalt von 0,336 % (Snowden NI 43-101, Dezember 2011).

 
Tonnen (Mt)
EQV Cu (%)
Cu (%)
Au (g/t)
Ag (g/t)
erkundet
4.866
0.419
0.47
0.05
27.82
angezeigt
16.406
0.557
0.64
0.12
26.45
Zwischensumme
21.272
0.525
0.60
0.10
26.70
Anmerkungen: (1) Schwefelanalysen sind in den oxidierten Böden selten
(2) Historische Oxid-Ressource kalkuliert von Malaysian Mining Corporation und überprüft von James Askew Associates (1990)

Eine qualifizierte Person hat nicht hinreichend daran gearbeitet, die historischen Kalkulationen als aktuelle Mineralressourcen zu klassifizieren. Der Herausgeber betrachtet die historischen Kalkulationen nicht als aktuelle Mineralressourcen. Demzufolge sollte man sich nicht auf die historische Ressourcenkalkulation verlassen. Eine zusätzliche Eisenerzproduktion, die aus dem im Skarn beherbergten Sulfiderz stammt, erfolgte in der Zeit von Juni 2010 bis Mai 2011, wie es in dem NI 43-101 konformen Bericht erwähnt wurde. Laut Malacos Aufzeichnungen verarbeitete während dieser Zeit die Zerkleinerungsanlage auf dem Mengapur-Gelände 209.328 Tonnen Skarngestein und produzierte 24.966 Tonnen Eisenerzklumpen mit einem dokumentierten durchschnittlichen Eisengehalt von 42 %. Der Betreiber erzielte für dieses Material einen durchschnittlichen Verkaufspreis von 37,00 USD pro Tonne (basierend auf dem Fe-Preis im Jahre 2010). Das Eisen wird in einer Kupferaufbereitungsanlage produziert, die ursprünglich auf der Liegenschaft stand und im Juni zu einer Eisenaufbereitungsanlage umgebaut wurde. Insgesamt wurden 26.693 Tonnen Eisenerz aufbereitet, um 3.168 Tonnen Fe-Konzentrat mit einem Durchschnittsgehalt von 63 % Fe in der Zeit von November 2010 bis Juli 2011 zu produzieren.

Das Unternehmen ist der Ansicht, dass die Ergebnisse der Aufbereitungsanlage eine brauchbare Demonstration des Potenzials für eine kommerzielle Eisenproduktion aus der Überdeckung auf dem Mengapur-Projekt liefern. Dies ist eine weitere Hilfe für die Entscheidung des Unternehmens, die Akquisition eines Mehrheitsanteils an dem Projekt weiter zu verfolgen.

Todd Johnson, P.E., MAusIMM, M.Sc. Ingenieurgeologie und M.Sc. Geologie, ist die qualifizierte Person laut National Instrument 43-101, die im Auftrag des Unternehmens die in dieser Pressemitteilung zusammengefasste technische Information geprüft und genehmigt hat."




 

 

 

462 Postings, 6354 Tage Pozelei...

 
  
    #4003
2
19.12.11 22:25

 Auch ich hatte eine Mail mit meinen Bedenken und Fragen an IR geschickt. Richard Cushing hat diese wohl gleich an Bob Baldock weitergeleitet. Und er hat nach einer Woche geantwortet. Wie nett ;) Hier ist sie, damit auch ihr es lesen könnt :)

 

"Dear Mr. *******,


 

This is a common question from thinking investors - and of course we do not
like these suggestions or the dilution either - but there are solid reasons
for this approach.

 

Firstly, the opportunity itself is unique for a small company to grow
quickly.  Our objective was to find a large project that would provide a
long and sustainable mine life (this is a 23 year mine life at present with
potential to be significantly longer).  We went searching for such a project
in South East Asia and did not expect to find one available in Malaysia -
and so close to us.  We have ambitions to become a sustainable dividend
payer for the shareholders.

 

The project has a positive bankable feasibility study done on it - but it is
historic - so we commissioned Snowden to re-do the report based on 43-101
standards, which they did and it is filed on SEDAR for you to see.  It is a
positive report and recommends we continue the work, which we intend to do.
However, the present owner (the vendor) had borrowed money from a bank for
his business dealings, including buying and trying to get Mengapur going.
He is not a public company but a family man and got into a lot of financial
trouble with other business interests etc.

 

We were lucky to be able to deal with him and through his bank.  The bank
debt was originally US$50.0 M and so the bank simply wanted their money back
after him being in default for 2 years.  They were at the end of their
patience when we came along.  However, we had to act quickly and with as
much assurance as possible.  Both the vendor and the bank were concerned
about our low capital base to be able to buy the project and get it into
production. Our plan is to use the equity raised plus cash flow to acquire
and build out the project to get into production.  

 

The vendor because he remains a 30% owner of the project - was concerned
that we take on no debt, especially with the present global and EU financial
crisis as it is - and threatening to get worse.  Even so, we looked to a
large mining bank that was lending to the mining industry at that time, and
it was impossible to get any sort of sensible finance from them - or get it
in the time frame needed.

 

What we had to end up doing to get the deal was to pay the vendors bank $5.0
M (it comes of the purchase price) to get the bank to agree to give us time
to call a shareholders meeting to obtain shareholders' approval by the end
of December 2011 - and then another period of time up to no later than end
of January 2012 to close the transaction.  We paid the $5.0 M and proceeded
to get the meeting going on 30 December and then close the deal by middle of
January, provided we get shareholder approval.

 

Getting shareholder approval was one thing, but getting suitable equity
finance in the time required was another.  We put pressure on an agent we
have successfully used before in Europe to guarantee to get us the funds,
which they did.  That was Procter.  Of course the time pressure and other
factors made it an unusual capital raise.  We insisted for instance that
there was a shareholders agreement to lock up the shares up all the with no
sales -  not for the usual 4-month required TSX-V period - but lock them up
for three years minimum.  Procter agreed, of course at a price to us in
order to get this type of investment.  Procter Advisers SA is at arm's
length to the company.

 

The reason we did this was that no later than June 2012 all of the
outstanding warrants will be exercised or cancelled and with this 3-year
lock up we will be able to develop a sensible IR program and share price
support program, which we are gearing up at the moment for next year. 

 

Therefore, with the equity only (no debt or convertible instruments)
conditions insisted by the vendor and the capital markets, together with the
time constraints of the vendor's bank, we had little room to maneuver -
particularly in a very bad capital market that is getting worse by the day.

 

Therefore while the dilution is large, there is little risk to shareholders
from bank or other debt.  At the same time, we believe that the EPS of $0.19
per share that Monument earned this year on a fully diluted basis will be
considerably exceeded with the additional EPS from the new project
potentially in the order of 2-3 times more on a fully diluted basis.

 

I hope that background is helpful to you.

 

Thanks and regards,

 

Bob Baldock"

 

 

8584 Postings, 8633 Tage RheumaxKann man wenigstens mal nachvollziehen

 
  
    #4004
1
19.12.11 22:44
was die Kerle geritten hat..

Danke!  

204 Postings, 5120 Tage LegnanoMMY - aussichtsreicher potenzieller Gewinn/Aktie

 
  
    #4005
20.12.11 02:20

Danke Pozelei. Ich bin positiv überrascht, dass Du schnell ein recht informatives Antwortschreiben von MMY erhalten hast. Übrigens stimmt mich die folgende Aussage sehr positiv, denn sie entspricht auch meiner bisherigen Einschätzung, dass sich voll verwässert der potenzielle Gewinn pro Aktie mit dem Mengapurprojekt um das 2- bis 3-fache erhöhen kann. Demzufolge währen langfristig, bei einem KGV von 10, Kurse zwischen 4 bis 6 $ möglich.

 

 

"Therefore while the dilution is large, there is little risk to shareholders
from bank or other debt.  At the same time, we believe that the EPS of $0.19
per share that Monument earned this year on a fully diluted basis will be
considerably exceeded with the additional EPS from the new project
potentially in the order of 2-3 times more on a fully diluted basis." (#4003)

 

Gruß, Legnano

 

 

 

462 Postings, 6354 Tage Pozelei...

 
  
    #4006
20.12.11 09:02

@Legnano:

Ja, Herr Baldock bringt da noch etwas mehr Licht ins Dunkel. Ohne Zweifel ist das ein schön zu lesendes Szenario! Wenn die Finanzierung durch geht auf der Versammlung, traue ich MMY schon zu so ein großes Projekt zügig und gewinnsteigernd ans laufen zu kriegen.

Das ich eine schnelle Antwort bekommen habe finde ich jetzt nicht so überraschend. Sie müssen ja möglichst viele Shareholder überzeugen. Und wenn ich mir die Berichterstattugn dieses Jahres anschaue (samt neuer Homepage und Galerie) muss ich sagen, dass sie sich doch etwas Mühe geben!

Ich springe nicht von Bord und bleibe weiterhin Long!

 

8584 Postings, 8633 Tage RheumaxKann man drehen und wenden

 
  
    #4007
1
20.12.11 17:53
wie man will:
Aber den Altaktionären wird hier schon einiges zugemutet.

Bedaure es jedenfalls ganz bestimmt nicht, einen kleinen Teil meiner MMY im Sommer - gerade noch rechtzeitig - gut 50 % über heutigem Kurs verkauft zu haben.

Mit dem Rest hoffe ich mal, dass die Rechnung des Herrn Baldock irgendwann aufgeht.
Bis dahin ist die Sache nicht mehr und nicht weniger als ein "schön zu lesendes Szenario"..  

462 Postings, 6354 Tage PozeleiNews

 
  
    #4008
21.12.11 18:55

December 21 2011

Monument Appoints Graham Dickson as Chairman of the Board

Release #22 - 2011

Vancouver, B.C. Monument Mining Limited (TSX-V: MMY and FSE: D7Q1)  “Monument” or the “Company” is pleased to announce that Graham Dickson  has assumed the role of Chairman of the Board of Directors of Monument  Mining Limited after  George Brazier tendered his resignation.
 
This change seperates the dual roles previousely held by George Brazier  as Chairman of the Board of Directors and Consultant of the Company  since January 2009.  As the company works its way toward the Mengapur  proposed acquisition and all of the legal work and consulting required,  Mr Brazier will concentrate on this apect of consulting in the near  term.    Mr. Brazier said: “I am very pleased that Graham Dickson has  agreed to assume the position of Chairman. It would be necessary for  Monument as a fast growing company to have an independent Chairman of  the Board of Directors.”
 
About Graham Dickson
 
Mr. Dickson is a mining executive with over 25 years of extensive  experience in the gold mining industry and has built numerous gold  treatment plants in remote areas of the world. In the past, he served in  various capacities with BYG Natural Resources Ltd., which had a gold  mine in the Yukon Territory. He also acted as General Manager of a  turnkey construction company for gold milling facilities in remote  locations, including the Snip Mill for Cominco Ltd., Golden Patricia  Mill for Bond Gold, Seebee Mill for Claude Resources and for surface  facilities at the Julietta mine for Bema Gold in Russia.  Mr. Dickson is  currently serving as Director and Senior Vice President Acquisitions  & Corporate Development of Yukon-Nevada Gold Corp., which holds a  diverse portfolio of gold, silver, zinc and copper properties in the  Yukon Territory and British Columbia, Canada as well as in the states of  Arizona and Nevada in the U.S.A.
 

 

462 Postings, 6354 Tage PozeleiNeue Präsentation zu Mengapur

 
  
    #4009
28.12.11 12:08

204 Postings, 5120 Tage LegnanoQuarthalszahlen - Q1 Geschäftsjahr 2011/2012

 
  
    #4010
3
30.12.11 16:07

 Quartahlszahlen - 1. Quartal (Q1) vom Fiskaljahr 2012:

sedar.com/GetFile.do

Quartahlszahlen - Diskussion und Analyse des Managements:

sedar.com/GetFile.do

Gruß, Legnano

 

19 Postings, 5184 Tage jogi21gute Zahlen

 
  
    #4011
30.12.11 18:12
Wie immer sind die Zahlen gut. Die Bude hat soviel Geld. Wir koennten schon ebenso reich sein. Schade dass der Kurs so gnadenlos schlecht ist. Irgendwie haben wohl alle Angst, dass MMY sich mit dem neuen Projekt uebernimmt und wieder jahrelang Geld investiert ohne was aus dem Boden zu holen. Ich hoffe deren Rechnung geht jedoch auf und bleibe dabei.  

462 Postings, 6354 Tage Pozelei...

 
  
    #4012
31.12.11 00:49

Naja, dafür das Selinsing in Rekordzeit zur Produktion gebracht wurde hast du aber wenig vertrauen ;)

 

462 Postings, 6354 Tage Pozelei...

 
  
    #4013
03.01.12 16:53

Wenigstens der Goldpreis spielt noch mit :)

 

462 Postings, 6354 Tage PozeleiNews

 
  
    #4014
04.01.12 18:47

January 4 2012

Monument Mining Announces Results of Annual and Special General Meeting of Shareholders

Release #02 - 2012

Vancouver, B.C. Monument Mining Limited (TSX-V: MMY and FSE: D7Q1)  “Monument” or the “Company” is pleased to announce the results from its  Annual General and Special Meeting held on December 30, 2011 (the  “Meeting”) in Vancouver, B.C., which had the record high turnout in  person or by proxy of over 55% of its issued and outstanding shares.
 
Board of Directors
 
At the Meeting, shareholders elected all of management’s 7 proposed nominees as directors for the ensuing year.
 
                Robert Baldock
                Graham Dickson
                Cathy Zhai
                Zaidi Harun
                George Brazier
                Jean-Edgar Trentinian
                Frank Wright
 
Auditor and Stock Option Plan
 
Shareholders also re-appointed Smythe Ratcliffe LLP, Chartered Accountants, to serve as the Company’s Auditors.
 
The adoption by the Company of a 10% rolling stock option plan, as  described in the Information Circular disseminated in connection with  the Meeting, was also approved.
 
Approval of the Acquisition of the Mengapur Project
 
Shareholders approved by a considerable margin the Company’s proposed  acquisition of the Mengapur Project in Malaysia.  The Mengapur project  was described in the Company’s Information Circular disseminated in  connection with the Meeting and in the Company’s other continuous  disclosure filings. 
 
“We are delighted by the endorsement received from our shareholders to  allow us to proceed with this very significant initiative to expand our  operations in Malaysia”, commented Mr. Baldock, President and Chief  Executive Officer.  “We will be working diligently over the coming weeks  to satisfy the remaining conditions needed to complete this  acquisition.  We have already made good progress on that front,  including securing additional adjacent property rights and satisfying  certain other due diligence matters”, added Mr. Baldock.
 
Approval of Private Placement Control Person
 
Shareholders also approved by a considerable margin of eligible  shareholders, the result that under the Company’s previously announced  proposed private placement financing, the proposed placee Tulum  Corporation Ltd. may become a “control person”, as defined under  applicable rules of the TSX Venture Exchange by virtue of it acquiring  more than 20% of the Company’s issued and outstanding shares at the  closing of the private placement. 
 
“The approval of this resolution will now allow us to proceed to  finalize matters with respect to the financing of the acquisition of the  Mengapur project”, commented Mr. Baldock.  “The endorsement of  shareholders on all major resolutions, including the Acquisition, the  change of control and the election of Management’s slate of Directors  represents significant support for the Management and the Board of  Directors going forward”. 

 

452 Postings, 5646 Tage hottesnews

 
  
    #4015
2
05.01.12 10:45
Monument Mining Ltd. gibt Ergebnisse der Jahreshaupt- und Sonderversammlung bekannt
10:42 05.01.12

Monument Mining Ltd. / Schlagwort(e): Hauptversammlung

Monument Mining Ltd. gibt Ergebnisse der Jahreshaupt- und Sonderversammlung
bekannt

05.01.2012 10:41
--------------------------------------------------

Vancouver, British Columbia, Kanada. 4. Januar 2012. Monument Mining
Limited (Frankfurt: WKN A0MSJR; TSX-V: MMY) ('Monument' oder das
'Unternehmen') gibt die Ergebnisse ihrer am 30. Dezember 2011 in Vancouver,
British Columbia, abgehaltenen Jahreshaupt- und Sonderversammlung (die
'Versammlung') bekannt. Sie hatte eine Rekordwahlbeteiligung (in Person
oder durch Stellvertreter) von über 55 % der emittierten und ausstehenden
Aktien.

Board of Directors

Die Aktionäre wählten alle 7 vom Management vorgeschlagenen Kandidaten als
Directors für das darauffolgende Jahr.

Robert Baldock  
Graham Dickson  
Cathy Zhai  
Zaidi Harun  
George Brazier  
Jean-Edgar Trentinian  
Frank Wright

Buchprüfer und Aktienoptionsplan

Die Aktionäre wählten ebenfalls wieder Smythe Ratcliffe LLP,
konzessionierter Wirtschaftsprüfer und Steuerberater, zum Buchprüfer des
Unternehmens.

Die Annahme eines 10% fortlaufenden Aktienoptionsplan durch das
Unternehmen, wie im Informationsrundschreiben beschrieben, das in
Verbindung mit der Versammlung verteilt wurde, wurde ebenfalls genehmigt.

Genehmigung der Akquisition des Mengapur-Projekts

Die Aktionäre genehmigten mit einer erheblichen Marge die vom Unternehmen
vorgeschlagene Akquisition des Mengapur-Projekts in Malaysia. Das
Mengapur-Projekt wurde im Informationsrundschreiben des Unternehmens, das
in Verbindung mit der Versammlung verteilt wurde, sowie in den anderen
Veröffentlichungen des Unternehmens beschrieben.

'Wir freuen uns sehr über die Zustimmung, die wir von unseren Aktionären
erhalten haben. Dies wird es uns ermöglichen, mit dieser sehr bedeutenden
Initiative zur Erweiterung unseres Geschäftsbetriebs in Malaysia
fortzufahren,' kommentierte Herr Baldock, President und Chief Executive
Officer. 'Wir werden in den kommenden Wochen sorgfältig arbeiten, um die
verbleibenden, zum Abschluss dieser Akquisition notwendigen Bedingungen zu
erfüllen. Wir haben bereits gute Fortschritte an dieser Front gemacht,
einschließlich der Sicherung der Rechte für benachbarte Grundstücke und der
Erfüllung bestimmter anderer Angelegenheiten,' fügte Herr Baldock hinzu.

Genehmigung der Kontrollperson der Privatplatzierung

Die Aktionäre genehmigten ebenfalls mit einer erheblichen Marge das
Ergebnis, dass gemäß der vom Unternehmen früher angekündigten geplanten
Privatplatzierung der vorgeschlagene Zeichner, Tulum Corporation Ltd. , wie
definiert in den geltenden Regeln der TSX Venture Exchange aufgrund der
Akquisition von mehr als 20 % der emittierten und ausstehenden Aktien des
Unternehmens bei Abschluss der Privatplatzierung, eine 'Kontrollperson'
werden könnte.

'Die Genehmigung dieses Beschlusses wird es uns erlauben damit
fortzufahren, die Angelegenheiten hinsichtlich der Finanzierung der
Akquisition des Mengapur-Projekts zum Abschluss zu bringen,' kommentierte
Herr Baldock. 'Die Zustimmung der Aktionäre zu allen wichtigen Beschlüssen,
einschließlich der Akquisition, dem Wechsel der Kontrolle und die Wahl der
Kandidaten des Management zu Directors repräsentiert eine bedeutende
Unterstützung für das Management und den Board of Directors in Zukunft.

204 Postings, 5120 Tage LegnanoMMY- Artikel zu den Zahlen des 1. Fiskalquartals

 
  
    #4016
05.01.12 14:57
Solides Quartal: Monument Mining erzielt im ersten Geschäftsquartal Nettogewinn von 12,695 Mio. USD | GOLDINVEST.de
Der kanadische Goldproduzent Monument Mining (WKN A0MSJR) kann für sein erstes Fiskalquartal, das am 30. September 2011 endete, solide Produktions- und Finanzzahlen vorlegen. Die Selinsing-Mine des Unternehmens in Malaysia beschert dem Unternehmen konstant schöne Gewinne.      Wie Monument am gestrigen Abend mitteilte, produzierte man von Juli bis Ende September auf der ...

"Wie Monument am gestrigen Abend mitteilte, produzierte man von Juli bis Ende September auf der Selinsing-Goldmine 11.846 Unzen des gelben Metalls. Davon verkaufte das Unternehmen 8.372 Unzen zu einem durchschnittlichen Preis von 1.724 USD pro Unze, was einen Umsatz von 14,430 Mio. USD generierte. Im gleichen Zeitraum des Vorjahres war bei einer Goldproduktion von 9.050 Unzen und verkauften 8.650 Unzen zu einem durchschnittlichen Preis von 1.256 USD pro Unze lediglich ein Umsatz von 10,863 Mio. USD angefallen. Im direkt vorangegangenen Quartal lag die Produktion bei 12.136 Unzen Gold, von denen 10.936 Unzen zu durchschnittlich 1.520 USD pro Unze verkauft wurden. Damit wurde ein Umsatz von rund 16,618 Mio. USD erzielt.

Der Nettogewinn der drei Monate bis zum 30. September 2011 erreichte rund 12,695 Mio. USD oder 0,09 USD pro Aktie (nicht verwässert) gegenüber einem Nettogewinn von 1,12 Mio. USD oder 0,01 USD pro Aktie im gleichen Zeitraum 2010. Im Quartal bis Ende Juni 2011 lag der Nettogewinn hingegen ebenfalls bei 12.695 Mio. USD bzw. 0,09 USD pro Aktie. Mit den neuesten Ergebnissen aus dem ersten Fiskalquartal verfügt Monument damit jetzt über ein positives Nettobetriebskapital von 75,0 Mio. USD als Ergebnis des Goldverkaufs und einer früheren Finanzierung.

Positiv ist zu vermerken, dass die Ausbringungsrate bei hohen 95,1% lag, während sie im vorangegangenen Quartal noch 94,1% betragen hatte. Die Goldgehalte allerdings lagen mit durchschnittlich 4,53 Gramm pro Tonne leicht unter den 4,58 Gramm pro Tonne des vorangegangenen Quartals. Gestiegen sind hingegen die Gesamtabbaukosten. Diese lagen im jetzt gemeldeten Quartal nach Angaben des Unternehmens bei 297 USD pro Unze. Im gleichen Zeitraum des Vorjahres hatten sie bei 199 USD pro Unze gelegen, während die Gesamtproduktionskosten im vergangenen Geschäftsjahr 242 pro Unze betrugen.

Darüber hinaus hat Monument im ersten Fiskalquartal die Planungsarbeiten für Phase III der Erweiterung der Aufbereitungsanlage auf dem Selinsing-Goldprojekt fortgesetzt. Man zielt dabei auf eine Verdopplung der Produktionskapazität von 40.000 Unzen auf 75.000 bis 80.000 Unzen ab. Alle Gerätschaften für diese Phase III der Erweiterung wurden bereits erworben. Die Stützmauer im Bereich der Kugelmühle, das Fundament der Dieseltanks und die Fundamente für den Turmkran wurden schon fertig gestellt. Zudem wurde bereits der Evaporator für das Tailings-Lager installiert und in Betrieb genommen.

Monument geht davon aus, dass man trotz der laufenden Erweiterungsarbeiten die Goldproduktion im laufenden Geschäftsjahr auf bis zu 55.000 Unzen steigern kann. Im vergangenen Geschäftsjahr lag der Ausstoß noch bei 44.438 Unzen Gold."

 

 

 

 

143 Postings, 5034 Tage ronaldo26canada kommt!

 
  
    #4017
05.01.12 18:24

462 Postings, 6354 Tage Pozelei...

 
  
    #4018
05.01.12 19:33

Kommt das vertrauen jetzt endlich wieder? Alle Vorzeichen sind auf grün gestellt! Ich persönlich traue es MMY durchaus zu schnell eine rentable Liegenschaft aus Mengapur zu machen. Die Phase 3 auf Selinsing läuft perfekt nach Plan und noch 44.000 Unzen sollen bis Juni folgen. Würde mich nicht wundern wenn es etwas mehr wird. Ich bin gespannt auf das kommende Jahr!

 

19 Postings, 5184 Tage jogi21die haben

 
  
    #4019
1
05.01.12 20:01
mehr Betriebskapital als die Bude an der Boerse wert ist. Das soll mal einer verstehen. Zudem Nettogewinn pro Share/Jahr hoeher als der Kurs....  jetzt hat man mal in eine Perle investiert und der Kurs gibts nicht her.... nachwievor sehr gute Fakten aber man muss guter Hoffnung bleiben.... dass mal der Kurs auch wiedergibt was passiert.  

204 Postings, 5120 Tage LegnanoLöschung

 
  
    #4020
05.01.12 23:17

Moderation
Zeitpunkt: 06.01.12 10:59
Aktion: Löschung des Beitrages
Kommentar: Löschung auf Wunsch des Verfassers

 

 

204 Postings, 5120 Tage LegnanoLöschung

 
  
    #4021
05.01.12 23:22

Moderation
Zeitpunkt: 06.01.12 11:00
Aktion: Löschung des Beitrages
Kommentar: Löschung auf Wunsch des Verfassers

 

 

204 Postings, 5120 Tage LegnanoMikroumsätze - trotzdem ein schöner Schlusskurs

 
  
    #4022
05.01.12 23:34

Das Chartbild ist zum Zungeschnalzen, trotzdem bin ich vorsichtig mit der Annahme, dass der heutige Kursanstieg nachhaltig ist, da die Umsätze einfach zu gering sind. Jedoch scheint die Drücker-Kolonne den Deckel vom Kochtopf heruntergenommen zu haben und lässt den zögerlichen Kaufinteressenten nun doch Luft das tiefgefrorene ASK zum erhitzen und das BID zum schmelzen zu bringen, denn fundamental brodelt es bei MMY sehr, es fehlt nur noch die Würze. Wie dem auch sei - Es ist nur eine Frage der Zeit bis zum Siedepunkt. Es bleibt nun noch zu hoffen, dass der Käufer-Appetit steigt. 

 
Angehängte Grafik:
2012_01_05_monument_mining.png (verkleinert auf 75%) vergrößern
2012_01_05_monument_mining.png

462 Postings, 6354 Tage Pozelei...

 
  
    #4023
1
06.01.12 11:58

Der Chart sieht auch wieder besser aus. Sind wieder am langfrsitigen Aufwärtstrend angekommen. Weiter so hoffe ich mal :) Die nächsten 11k Unzen Gold sind schon in arbeit!

 

 
Angehängte Grafik:
profichart_06012012_1124.png (verkleinert auf 69%) vergrößern
profichart_06012012_1124.png

204 Postings, 5120 Tage LegnanoMMY - Neue Fotos - Phase III Erweiterung Selensing

 
  
    #4024
1
06.01.12 16:32

462 Postings, 6354 Tage Pozelei...

 
  
    #4025
06.01.12 16:54

Darauf hab ich gewartet. Schaue jeden Tag in die Gallerie ob was neues da ist. Du warst wohl fixer als ich ;)

 

Seite: < 1 | ... | 159 | 160 |
| 162 | 163 | ... 197  >  
   Antwort einfügen - nach oben