International Enexco (TSX: IEC / WKN: 857547)
Seite 1 von 2 Neuester Beitrag: 09.12.10 14:42 | ||||
Eröffnet am: | 21.05.10 11:18 | von: marcourt | Anzahl Beiträge: | 36 |
Neuester Beitrag: | 09.12.10 14:42 | von: Base | Leser gesamt: | 6.183 |
Forum: | Hot-Stocks | Leser heute: | 9 | |
Bewertet mit: | ||||
Seite: < | 2 > |
Aktienanzahl:
ausstehend: 22.553.077
Fully Diluted: 24.928.077
Market Cap bei 0,27 CAD: 6,75 Mio. CAD
Cash: 5,6 Mio. CAD (letzter aktueller Quartalsbericht auf sedar.com)
Die Fakten
- sehr erfahrenes Management mit nachgewiesenem Track Record. (z.B. ehemalige Führungspositionen von Teck Cominco, Yamana Gold, Exxon)
- Weit entwickeltes Kupferprojekt "Contact" mit positiver pre-feasibility vom August 2009. Ressource: 786 Mio. Pfund Kupfer (davon 481 Mio. Pfund measured & indicated)
- erstklassige Uranliegenschaft. "Mann Lake". Der Uranriese Cameco hält 52,5%, Areva 17,5% und International Enexco die restlichen 30%
- Zwei Goldliegenschaften über Joint Ventures in Nevada, einem der aussichtsreichsten Gebiete der Erde
- 5,6 Mio. CAD (kanadische Dollar) Cash per 31. Dez. 2009
- Marktkapitalisierung nur 6,75 Mio. CAD
- Ca. 55% aller Aktien in Händen des Managements und Institutionellen
Von den 25 Mio. Aktien befinden sich 55% in Händen des Managements und institutionellen Anlegern. Nur rund 11 Mio. Aktien sind also frei handelbar.
Die Projekte
Contact Kupfer Projekt Bei Contact handelt es sich um ein weitentwickeltes Kupfer Projekt im Nordosten von Nevada, IEC hält hier 100%. Im August 2009 legte man eine positive Vor-Machbarkeits-Studie vor, die Cashkosten von nur 0,97 $ pro Pfund Kupfer bescheinigt. Die Ressourcen belaufen sich auf 786 Mio. Pfund Kupfer (davon 481 Mio. Pfund measured & indicated) + 197 Mio. Pfund an Reserven. Analysen haben gezeigt, dass zusätzliche Bohrungen die Reserven um 50% erhöhen und die Minenlebensdauer von 7 auf 11 Jahre verlängern könnten. Ende November gab man bekannt, dass man auf Contact ein neues Bohrprogramm auflegen möchte um dieses Ziel zu erreichen und dabei auch benachbarte Zonen erforschen möchte. Für die Produktion käme das kostengünstige "open pit" Verfahren zum Einsatz. Die Anlaufkosten für die Mine würden sich lt. pre-feasibility auf 83 Mio. $ belaufen.
Die Vor-Machbarkeits-Studie kann hier abgerufen werden: PRE-FEASIBILITY !
http://www.enexco.ca/userfiles/file/Contact_PFS_FINAL%20REV.pdf
Gold – Zwei Joint Ventures in Nevada
Hot Pot (JV mit Nevada Exploration) Die Hot Pot Liegenschaft ist ein Joint-Venture zwischen International Enexco und Nevada Exploration. Hot Pot befindet sich am nördlichen Ende des "Battle Mountain – Eureka Gold Trends", der in der Vergangenheit für Übernahmen bekannt war. Das Gebiet befindet sich nur 6km östlich der "Lone Tree" Mine von Newmont (ein 5 Mio. Unzen Gold-Deposit) und 13km nördlich der "Marigold" Mine von Goldcorp (4 Mio. Unzen Gold-Deposit). IEC erwirbt 70% an dem Projekt, wenn Sie innerhalb der kommenden 4 Jahre nur 9.000m an Bohrarbeiten durchführen. Am 14. Dezember vermeldete man, dass knapp 3.500m bereits gebohrt wurden, es geht also rasch voran.
Die Goldanomalien welche von Nevada Exploration (TSX: NGE) festgestellt wurden, sollen durch die kürzlich abgeschlossenen Bohrungen bestätigt werden. Das interessante an Hot Pot ist, die Art der Exploration. Der Partner Nevada Exploration hat hier bereits 10 Mio. $ in die Untersuchung der Liegenschaft investiert. Man ging hier einen etwas ungewöhnlichen Weg und erforschte die Goldvorkommen im Grundwasser nahe bereits bestätigter großer Gold-Deposits. Dabei stellte man fest, dass sowohl die Geologie als auch die Werte im Grundwasser denen der benachbarten Multi-Millionen-Unzen Gebiete ähneln.
Loomis Mountain (JV mit Fronteer Development) Loomis liegt 32km nördlich von Wells, Nevada ist ein Joint-Venture zusammen mit der Fronteer Development Group (TSX: FRG). Die Geologie in diesem Gebiet ist analog zu der des Carlin Trends. IEC bekommt nach Abschluss von 11.000 Bohrmetern 51% an dem Projekt zugesprochen. Am 14. Dezember gab man die Ergebnisse von ersten Anomalietests bekannt. In 12 Bohrlöchern verbohrte man 2.000m. Die Bohrungen haben eine breite Zone der anomalen Gold-Mineralisierung bestätigt. Die Ergebnisse lassen darauf schließen, dass sich unterhalb der soeben abgeschlossenen Bohrungen eine hochgradigere Zone befindet. Ein Folgeprogramm mit Tiefenbohrungen ist bereits in der Planung.
Mann Lake Uran (JV mit Cameco und Areva) Diese hochgradige Uranliegenschaft teilen sich drei Unternehmen. IEC bezeichnet es als "strategische Allianz" zwischen Cameco (52.5%), Areva (17,5%) und natürlich sich selbst mit einem Anteil von 30%. Dieses Projekt war ausschlaggebend für den raketenhaften Anstieg welcher Anfang 2007 bei über 4 CAD sein Hoch fand. Grund waren die hochgradigen Uranfunde (7,12% 5,53% Uran) – IEC wurde dann natürlich Teil des jüngsten Uranbooms. Die Liegenschaft liegt im Urangebiet der Erde schlechthin, dem Athabasca Becken. Mit Cameco und Areva hat man die größten Urankonzerne der Welt mit im Boot.
Nicht nur die Projektpartner sind hier allererste Sahne, sondern auch die Lage lässt andere Unternehmen vor Neid erblassen. 25km südwestlich befindet sich mit Camecos Mc Arthur River die größte hochgradige Uranliegenschaft der Erde und 20km nordöstlich liegt das Millenium Deposit, ebenfalls von Cameco.
Seit Dezember laufen hier die Arbeiten um ein neues Bohrprogramm zu starten. Der Operator Cameco plant 4 bis 5 Bohrlöcher. 2 davon sollen westlich der hochgradigen Entdeckung von 2006 die Funde bestätigen. Man darf also auch hier auf Ergebnisse gespannt sein.
Im Link die letzte News zu Mann Lake: http://www.enexco.ca/main/?news&newsidnew=61
Fazit: Bei International Enexco kommt alles zusammen was sich ein Rohstoffanleger wünscht. Ein überaus erfahrenes Management, welches es bestens versteht ein Unternehmen nach oben zu bringen. Diesen Männern kommt es nicht mehr auf das Geld an, sie sind einfach süchtig nach Erfolg. Der Direktor, CEO und Präsident von International Enexco, G. Arnold Armstrong, war bei der Gründungsphase der heutigen Silvercorp Metals (TSX: SVM) dabei, und formte so aus einer Firma mit einem Börsenwert von 6 Mio. $ einen Silberproduzenten der heute an der Börse mit über 1 Milliarde $ bewertet ist. Er hält heute übrigens rund 6,9 Mio. Aktien von International Enexco, und ist damit der größte Anteilsinhaber. Das gesamte Management hält rund 35% aller Aktien, große Institutionen und Fonds halten zusammen ca. 20%. Bleiben also 45% der ohnehin schon geringen Aktienanzahl von 22,6 Mio. im freien Handel, das sind etwas mehr als 10 Mio. Stücke. IEC kann also eine exzellente Aktienstruktur vorweisen. Das Projektportfolio von IEC ist erstklassig diversifiziert, neben einer weit entwickelten Kupfer-Liegenschaft nebst pre-feasibility Studie, hat man eine 30%-ige Beteiligung an einem Uran-Projekt mit den Größen der Branche (Cameco und Areva sprechen für sich) und zwei Gold-Joint-Ventures in Nevada, einem der aussichtsreichsten Goldgebiete der Erde. Alleine die Kupfer-Liegenschaft würde eine weitaus höhere Bewertung rechtfertigen. Betrachtet man nur die Kupfer-Liegenschaft und bewertet diese mit 2 Cent pro Pfund Kupfer ergäbe sich bei 25 Mio. ausstehenden Aktien bereits ein Kurs von 0,78 CAD. Zählt man jetzt noch die Cash-Position in Höhe von 5,6 Mio. CAD dazu errechne ich einen Kurs von 1,01 CAD. In dieser Kurs-Projektion sind die Mann Lake Uranliegenschaft welche für den letzten Run auf über 4 CAD verantwortlich war und die zwei Gold-Joint-Ventures in Nevada nicht berücksichtigt. Dabei könnte ausgerechnet die Hot Pot Liegenschaft für richtig Würze sorgen. Ergebnisse ausstehend!
Letzter Schlusskurs: 0,265 CAD / entspricht 0,197 EUR
International Enexco (TSX: IEC / WKN: 857547)
Webiste: www.enexco.ca/
Alle sedar Filings: sedar.com/DisplayCompanyDocuments.do
IEC/NGE
Hot Pot: JV-Project von Intl. Enexco & Nevada Exploration
Review: Detaillierte Fakten bezüglich der Goldliegenschaft
http://www.nevadaexploration.com/_r....ical-Summary-04-02-09.pdf
PROPERTY DESCRIPTION
The Hot Pot project is located along the Battle Mountain – Eureka Gold Trend and was identified as a direct result of our groundwater exploration program. NGE has leased the mineral rights on 3.4 square miles of private ranch land. The property lies approximately five miles east of Newmont’s 5,000,000+ ounce Lone Tree mine and six miles north of Gold Corp Inc.’s 4,000,000+ ounce Marigold mine.
A Phase I, nine-hole reverse circulation drill program was completed in 2005 and encountered shallow, hydrothermally-altered bedrock reporting anomalous gold (up to 0.37 ppm) and trace elements over a wide area. More detailed groundwater sampling, seismic geophysics and detailed gravity geophysics directed an additional ten reverse circulation drill holes in 2008. Although potentially economic quantities of gold mineralization have not yet been encountered, drilling to date has been wide-spaced and could have easily missed the type of high-angle fault zones that control significant known gold mineralization elsewhere in the region. The widely-distributed, highly anomalous gold in groundwater together with the hydrothermally-altered and geochemically anomalous bedrock strongly suggests that higher values for gold in bedrock than have been discovered to date may still be located nearby. The next step is more closely-spaced, shallow, vertical drill holes and/or deeper, angle holes targeted to intersect steeply-dipping, potentially ore-bearing fault zones and favorable bedrock units.
Hot Pot (Au) Project : summary
•Located along the Battle Mountain – Eureka Gold Trend.
•Approximately five miles east of Newmont’s 5,000,000+ ounce Lone Tree mine and six miles north of Gold Corp Inc.’s 4,000,000+ ounce Marigold mine.
•Leased the mineral rights on 3.4 square miles of private ranch land.
Historical work:
•A Phase I, nine-hole reverse circulation drill program was completed in 2005 and encountered shallow, hydrothermally-altered bedrock reporting anomalous gold (up to 0.37 ppm) and trace elements over a wide area.
•More detailed groundwater sampling, seismic geophysics and detailed gravity geophysics directed an additional ten reverse circulation drill holes in 2008.
Although potentially economic quantities of gold mineralization have not yet been encountered, drilling to date has been wide-spaced and could have easily missed the type of high-angle fault zones that control significant known gold mineralization elsewhere in the region. The widely-distributed, highly anomalous gold in groundwater together with the hydrothermally-altered and geochemically anomalous bedrock strongly suggests that higher values for gold in bedrock than have been discovered to date may still be located nearby. The next step is more closely-spaced, shallow, vertical drill holes and/or deeper, angle holes targeted to intersect steeply-dipping, potentially ore-bearing fault zones and favorable bedrock units.
Shares outstanding: 22,5Mio
Fully diluted: 24,9Mio f/d. (2,4Mio Opt.+Warr.)
realer freefloat: ~ 10Mio shares
Cash: ~ 6,5Mio CAD
Cash per share: ~ 0,27 CAD
Erstklassige share structure & shareholder profile!
Der CEO von Enexco, Mr. G. Armstrong hält derweilen mehr als 30% der Anteile an Enexco.
Aggregiert kommt das Management auf ca. 40% der Anteile, weitere 20% der shares sind in festen Händen bei Institutionen untergebracht.
Demnach kommt man auf einen realen freefloat von nur 10Mio shares an der TSX!
Quelle: sedar.com/Findancial reports
Mr. Armstrong owns or controls an
aggregate of 300,000 options to purchase common shares, 7,050,732 common shares
and 651,620 share purchase warrants, representing, in aggregate, prior to the exercise
of any convertible securities held by Mr. Armstrong, approximately 31.26% of the issued
and outstanding common shares of the Company, and on a partially diluted basis after
the exercise of the warrants and other convertible securities held by Mr. Armstrong only,
approximately 34.05% of the capital of the Company.
Contact project (Copper/Silver Resource Nevada, USA)
Die Weiterentwicklung dieses fortgeschrittenen Projektes könnte 2010 für einige Überraschungen sorgen. Große Potenziale sind unter anderem in den high grade intervals der historischen drills in den Tiefen zu finden. Dort unten könnte es bei erfolgreichen Treffern in den nächsten, geplanten Bohrprogrammen richtig spannend werden..
..Additional Upside Potential
The resourse at contact remains open at depth and along strike thereby giving the project the potential to increase in size. At depths between 1,500 and 2000 feet, historic drilling (not to 43-101 standards) encountered high grade intervals of copper mineralization including 3.7 metres os 20.8% copper with 207g/t silver and 14 metres of 9.2% copper with 144g/t silver. This high-grade zone has not since been properly evaluated for additional high grade potential and could prove to be a substantially large increase to the size of the project.
History
Enexco’s initial phase of drilling focused on mineralization on the east end of the patented claim block on the Delano #1 and Delano #2 claims. Using a drilling contractor, 15,000 feet of core in 18 holes were completed by April 2007. In an effort to expand the program and control costs, Enexco continued drilling by purchasing two core drills and hiring its own crews. By December, 2008, Enexco crews completed another 106,031 feet of core in 115 holes. The drilling included in-fill holes, as well as holes for obtaining metallurgical material and testing a deep target area of high grade copper encountered in a drill hole by Phelps Dodge. All assays for the 2007-2008 drilling have been completed and are included in the resource estimation in this report. Drilling, meanwhile, has continued outside of the main resource area. As of May, 2009, another 19,096 feet of core were drilled in 19 holes with the potential of expanding the resource base west and south. The assays for the 2009 drilling are pending..
Pre- Feasibilty Study
http://enexco.ca/userfiles/file/Contact_PFS_FINAL%20REV.pdf
(c) golden_times @ peketec
Schon einige Monate alt, die vermittelten Infos (& Eindrücke) von diesem Mann sind dennoch zeitlos interessant..
Courtesy of Casey Research
Arnold Armstrong
By People Of Interest
CEO & President, International Enexco
Director, Chairman, Red Hill Energy Inc.
http://www.gold-speculator.com/peop....154-arnold-armstrong.html
..
XL: We haven’t mentioned the Contact Lake deposit that you have with International Enexco. That’s going to be big.
AA: I started to mention that with Coralta. At the time, I was working on a property with a chap named Ken Chattin in Contact, Nevada.
XL: And what time period is this?
This is around 1973. We drilled a number of holes. We proved up about 7.3 million tons of 2.31% copper, and a half an ounce of silver. But the price of copper dropped on down below $0.60. To mine it, our costs would also have been about $0.60, and that didn’t make any sense. So we put it in mothballs. Then we farmed it out to Phelps Dodge. It was a very tough contract with them at the time.
XL: You basically bullied them, right?
Yes, I suppose so. But it wasn’t smart. So, they drilled this hole called PD-4. It was into the sulfides and it went down 2,200 feet, and wound up with one section of 22% copper, together with gold and silver, together with another section that was around 20% copper. Overall we ended up with around 15 feet of approximately 21% copper. They called it a million-dollar hole, in those days. A million-dollar hole then is like a ten-million dollar hole now. But that’s when the copper price dropped way down. With everything depressed, and Phelps Dodge were putting two huge mines into production, so they walked. We retained it for a number of years after that. Then we farmed it out again to a company called Golden Phoenix. They had it for seven years, but the price of copper was still down, fluctuating between $0.60 and $0.70. Well then, luckily enough, they defaulted. So, I took the property back. That was two years ago now. Then I immediately went in and staked everything that was open, and luckily it was open. Golden Phoenix had some other claims that were important to us, so I negotiated a deal whereby I took control of those over from them, in return for giving them a release from the claims against them. That’s the way it was at that stage. Then we did a 43-101 on it, and we proved up a substantial tonnage. We’re now at the stage where we have about 14 million tons, proven and inferred. We’re on a drill program now where we’ve drilled four holes and we’re on the fifth hole now.
XL: Your goal is to double the resource to 28 million tons, right?
Yeah, but I’m not too sure we’re going to do that. What we’re doing is taking it one step further to the proven stage with the oxides. Then, we’ll go into the exploratory on the PD-4. That’s into the sulfides. But the idea is that I’m going to bring the oxides into production because we do have substantial tonnage.
XL: Why have you not twinned that PD-4, just for market attention?
I know that people talked about why I was not doing the exploratory. We went out and raised about $16 million for the treasury. I want to put it into production. If I go full tilt, the earliest I can do it is in two years. The drilling program has to get to the stage where I have measured tonnage. We’re on a 6,000-meter drilling program at the moment. We’ve just secured another drill. And we’re going to have another 6 000 program. When we’ve done that, we’re ready. I’ve hired an engineer. He’s got his Ph.D. and he’s going to do the metallurgy, and the mine planning and so on. So after this is done, we’ll do the exploratory work, but at the same time we’re going to be getting everything ready for production. That’s the game plan. So the company is doing very well. It’s got proven, well, I call them proven reserves. They’re not really at that state, but they will be, very shortly. Substantial tonnage, ready to go into production from the oxide standpoint, maybe it’ll be heap leaching or maybe it’ll be a ball mill. Maybe it’ll be an SXEW plant. All of this will be determined as we go along. That’s why I’ve hired the other people. Then I’ve hired another man to work strictly on permitting, and then I have our project geologist as well. We got a nice little team put together down there, and it’s working well..
XL: Someone like you who’s been in all these different cycles, when you feel today’s euphoria with people saying “Ah, uranium’s going hit a hundred bucks.” Could you tell the readers about the past cycles and say whether or not it’s the same sort of feeling.
In the sixties, when we had Pyramid, it was wild jubilation because it was so widely held. And that carried on. Then we had a lull in the ‘70s. And then in the late ‘70s, it started to boom again. In the ‘80s – just the beginning of the ‘80s – everything went all to hell again. So it’s like a business cycle, ups and downs and ups. And then, in the late ’80s, it started again. This boom that’s taking place right now is unprecedented.
XL: Really?
We have never ever had a situation where every metal has moved up. And all together. Not just a small amount either, it’s substantial. I mean, who ever thought you were going see a time when copper would go as high as it did. We use a figure of a $1.25/lb to $1.50/lb for copper, by the way. But, you know, gold is moving. I see gold moving further because of the weakness in the U.S. dollar.
XL: Arnie, your vision of the dollar. You were around during the currency crisis, you were around when the U.S. dollar de-coupled from gold. What do you see happening with the dollar?
Well, with the dollar, it’s quite obvious. They can’t keep printing money. And that’s what they’re doing. They’re just printing money unbelievably, which is inflationary..
danke golden_times @ peketec
Ellis Martin interviews Paul McKenzie, Director of International Enexco (IEC.V)
http://www.youtube.com/watch?v=jLl5x_vK-fc
2010-06-02 09:24 ET - News Release
Mr. Arnold Armstrong reports
INTERNATIONAL ENEXCO LTD. REPORTS UPDATED PRE-FEASIBILITY STUDY FOR THE CONTACT COPPER PROJECT, NEVADA
International Enexco Ltd. has received an update to the 2009 prefeasibility study (PFS) for its 100-per-cent-owned Contact copper project in Nevada, in accordance with Canadian National Instrument 43-101 -- standards of disclosure for mineral projects (NI 43-101).
The update and 2009 PFS are NI 43-101-compliant studies prepared for Enexco by Gustavson Associates LLC of Lakewood, Colo., an independent engineering consulting group. The update is based on addition of 2009 drilling results, and includes reinterpolation of the resource model and optimization of the pit design using parameters from the PFS. The changes result in a 161-per-cent increase in minable copper, and improvements to the cash flow model of 20.2-per-cent internal rate of return (IRR), up from 13.2 per cent in the PFS, and a net present value (NPV) at a 10-per-cent-discount rate of $44.5-million, up from $9.7-million in the PFS.
The updated mineral resource at Contact now stands at 711.8 million pounds of copper (298.3 million pounds measured and 413.4 million pounds indicated) (135.2 million tons at 0.263 per cent copper), with an inferred resource of 291 million pounds of copper (53.4 million tons at 0.272 per cent Cu), based on a 0.1-per-cent Cu cut-off grade. The update includes an additional 20,745 feet of core that were completed in 20 drill holes, along with the reinterpretation of geologic contacts and revised criteria for grade interpolation using an ID-2 model, and the classification of resources.
MINERAL RESOURCE ESTIMATE REPORTED
AT 0.1 PER CENT CU CUT-OFF
Copper
category Tons Cu (%) Pounds Cu
Measured 52,976,000 0.282 298,397,000
Indicated 82,233,000 0.251 413,413,000
Measured and indicated 135,209,000 0.263 711,810,000
Inferred 53,490,000 0.272 291,368,000
The copper reserves are now estimated at 27 million tons at 0.3 per cent Cu proven and 27.1 million tons at 0.28 per cent Cu probable, totalling 54.1 million tons of 0.28 per cent Cu, or 317 million pounds of Cu in proven and probable reserves. No inferred resources were used in either the production schedule or economic analysis. The updated reserves represent a 161-per-cent increase in copper reserves, up from 33.6 million tons of 0.29 per cent Cu, or 197 million pounds of Cu proven and probable reserves in the 2009 PFS.
MINERAL RESERVE ESTIMATE
REPORTED AT 0.1 PER CENT CU CUT-OFF
Copper
category Tons Cu (%) Pounds Cu
Proven 27,011,000 0.305 164,701,000
Probable 27,138,000 0.280 152,199,000
Proven plus probable 54,149,000 0.293 316,899,000
For the updated PFS, Gustavson developed a nine-year mine plan and production schedule, based on an open-pit mine producing 5.6 million tons of ore per year at an overall 2.9:1 strip ratio. Copper recovery is unchanged from the PFS net overall recovery of 76 per cent. Overall production is projected at 241 million pounds of copper, supporting 25 million pounds per year of cathode copper from heap leaching and solvent extraction electrowinning (SX/EW), at an average cash cost projected at 93 cents per pound. The initial capital costs are now estimated at $88-million, including a contingency of 20 per cent. Based on the PFS copper price of $2.25 per pound, the project after-tax net present value (NPV) at a 10-per-cent-discount rate is forecast at $44.5-million, up from $9.7-million, and the internal rate of return (IRR) is 20.2 per cent, up from 13.2 per cent in the PFS.
In light of the results, Arnold Armstrong, president and chief executive officer, commented:
"The updated PFS is another milestone for the Contact project. The global economy continues to show demand for copper. We believe we have a viable project in Contact, and still have room for further improvement. With the new results, we are evaluating how to best proceed, whether through additional drilling or by permitting and engineering studies that will lead us more directly to production."
A copy of the full updated PFS technical report will be filed on the SEDAR website within 45 days.
The technical content of this news was reviewed and approved by William Crowl and Terre Lane of Gustavson, who are qualified persons (QP) as defined by Canadian National Instrument 43-101.
We seek Safe Harbor.
http://www.stockwatch.com/newsit/ne....p;symbol=IEC®ion=C
Die neue Studie übertrifft die alte Studie vom Juni 2009 in allen Kategorien. TOP!
Die Ressourcen konnten von 785,5 Mio. Pfund auf 1.003,2 Mio. Pfund Kupfer ausgeweitet werden, die Reserven stiegen von 196,7 Mio. Pfund auf 316,9 Mio. Pfund Kupfer.
Das abbaufähige Kupfer (Reserven) wurden insgesamt um 61% erhöht.
Die geschätzen Produktionskosten sind von 97 Cent auf 93 Cent pro Pfund Kupfer gefallen. Sehr gut!
Der Net Present Value (NPV; Kapitalwert) des Contact Kupfer Projekts stieg von 9,7 Mio. Dollar auf 44,5 Mio. Dollar an, ein Zuwachs von 358% !!
Das Cash-Flow Modell (IRR; Internal Rate of Return oder Interner Zinsfuss) stieg von 13,2% auf 20,2%
Der Net Present Value stieg auf 44,5 Mio. CAD an, das entspricht 1,97 CAD pro Aktie! Eine Kopie der neuen Vor-Machbarkeitsstudie soll innerhalb der nächsten 45 Tage auf sedar.com verfügbar sein. Auch der CEO von International Enexco, Arnold Armstrong kaufte in den letzten Tagen nochmals 50.000 Aktien (er hält bereits über 6 Mio. Stücke!)
Filing Date | Transaction Date | Insider Name | Ownership Type | Securities | Nature of transaction | # or value acquired or disposed of | Unit Price |
May 27/10 | May 26/10 | Armstrong, Arnold | Indirect Ownership | Common Shares without par value | 10 - Acquisition in the public market | 25,000 | $0.300 |
May 27/10 | May 26/10 | Armstrong, Arnold | Indirect Ownership | Common Shares without par value | 10 - Acquisition in the public market | 5,000 | $0.295 |
May 27/10 | May 26/10 | Armstrong, Arnold | Indirect Ownership | Common Shares without par value | 10 - Acquisition in the public market | 10,000 | $0.290 |
May 27/10 | May 26/10 | Armstrong, Arnold | Indirect Ownership | Common Shares without par value | 10 - Acquisition in the public market | 10,000 | $0.275 |
Gestern +23,4% in Kanada. Na das ist doch schon mal was
Kaufinteresse ist jedenfalls da, und das meiner Meinung nach vollkommen zurecht.
Solange sich die Aktie noch weitestgehend "unter dem Radar" bewegt (bis auf einen ziemlich guten BB der darüber berichtet), kann man noch einige günstige Stücke sammeln gehen.
Sollen mal schön ihr Contact Kupfer Projekt weiter ausbauen.
Ansonsten kann man nur warten bis Cameco (Operator von Mann Lake) auf dem Uranprojekt das Bohren beginnt. Da könnte uns eine Überraschung bevorstehen.
- keine kauf- oder verkaufsempfehlung -
2010-10-18 19:32 ET - Miscellaneous
In accordance with Policy 2.5, the company has met the requirements for a Tier 1 company. Therefore, effective Oct. 19, 2010, the company's tier classification will change from Tier 2 to Tier 1.
5. Graduation from Tier 2 To Tier 1
5.1 If the management of a Tier 2 Issuer reasonably believes that the Issuer meets all of the Tier 1 ILR, the Tier 2 Issuer may apply in writing to the Exchange for graduation to Tier 1.
5.2 The Exchange will request that an application made under section 5.1 include details on the Issuer’s ability to meet Tier 1 Public Distribution standards under applicable ILR and the fee prescribed by Policy 1.3 - Schedule of Fees.
5.3 The Exchange will make any determination on graduation based on its review of the document(s) submitted by the Issuer under section 5.2 and any other documents filed by the Issuer and available on SEDAR. Where necessary, the Exchange may also request from the Issuer other documents during its review prior to and for the purposes of making any final determination on graduation.
5. 4 The Exchange may refuse an application for graduation to Tier 1 even where the Issuer appears
----
Vielleicht kann hier jemand was rauslesen. Das ist die angesprochene Policy 2.5 der kanadischen Börse : http://www.tmx.com/en/pdf/Policy2-5.pdf
-----
Tier 1 is the Exchange’s premier tier and is reserved for the Exchange’s most advanced Issuers with the most significant financial resources. Tier 1 Issuers benefit from decreased filing requirements and improved service standards. Tier 2 is the tier where the majority of the Exchange’s listed Issuers will trade.
In diesem Dokument sind auch nochmal die Anforderungen für Tier 2 und Tier 1 beschrieben: http://www.tmx.com/en/pdf/Policy2-1.pdf
Um Tier 1 Anforderungen zu erfüllen, müssen vor allem die Assets (Vermögenswerte) höher sein als bei Tier 2.
- Kupfer Projekt vor der Produktion
- Uranprojekt mit aussichtsreichen Urangehalten
- Goldprojekt mit Potential
Ich weiß nicht was ein Wert noch alles bieten soll. Ich bin jedenfalls hier drin.
Measured + Indicated 711,810,000 Pound Cu = ca. 350000 t/Cu
Kupferpreis = 8290 $/t
Aktuelle Marktkapitalisierung ca. 9 Mio. CAD
Also ich kaufe nach :-)
"Uran: Das Comeback!
während hierzulande über Castor-Transporte und Atommüll-Endlagerung hitzig diskutiert wird, werden anderswo neue Atomkraftwerke gebaut.
Das kann man gut finden oder auch nicht. Fakt ist: Der Uranpreis steigt wieder und die Aussichten für den Yellow Cake sind strahlend hell.
Lesen Sie, warum die kommenden Monaten einen anhaltenden Uranboom bringen könnten.
Seit ich an dieser Stelle zum letzten Mal ausführlich über Uran berichtet habe, sind fast vier Jahre vergangen. Bei meinen Recherchen ist mir aufgefallen, dass sich in dieser Zeit an der Angebots-/Nachfragesituation und damit den prinzipiellen Aussichten gar nicht so viel getan hat. Die Fakten sind im Prinzip ganz ähnlich, selbst die konkreten Zahlen haben sich nur leicht verändert.
Trotzdem hat sich der Uranpreis seit den Hochs im April 2007 mehr als halbiert. Die weltweite Finanzkrise hat wie auch bei anderen Rohstoffen ihren Tribut gefordert. Im Unterschied zu beispielsweise Gold und Silber, die längst die Vorkrisenhochs wieder erreicht und überschritten haben, hat Uran aber erst seit wenigen Wochen zu einer Erholungsbewegung angesetzt. Diese verläuft allerdings sehr dynamisch. Die aktuelle Entwicklung des Uranpreises können Sie hier http://www.uxc.com/review/uxc_Prices.aspx verfolgen: Die Preisaktualisierung ist wöchentlich und am Montag dieser Woche machte der Preis einen Satz um fünf US-Dollar oder fast zehn Prozent nach oben auf 58,50 US-Dollar je Pfund.
Das Allzeit-Hoch aus dem April 2007 lag jedoch bei knapp 140 US-Dollar je Pfund. Bis dahin besteht also noch ein Potenzial von über 100 Prozent. Die Chancen, dass der Preis in nicht allzu ferner Zukunft die alte Rekordmarke wieder erreichen könnte, stehen nicht schlecht.
*Fundamental stehen die Zeichen auf Sturm
Im Gegensatz zu anderen Rohstoffen, wo oft zu Unrecht von Knappheit gesprochen wird, herrscht bei Uran tatsächlich ein Angebotsmangel. Die EURATOM Supply Agency ESA, eine offizielle und neutrale Organisation der EU-Kommission, hat dies in ihrem Jahresbericht 2009 nachgewiesen.
Nach wie vor reicht die derzeit mögliche Uranproduktion aus Minen gerade einmal zur Bedienung von 60 Prozent der jährlichen Nachfrage durch über 400 Atomkraftwerke aus. Die Hoffnung, dass bereits in diesem Jahr substantielles neues Angebot auf den Markt komme, wurde durch anhaltende Verzögerungen bei der Inbetriebnahme von Minen zunichte gemacht.
Der Produktionsbeginn des weltweit größten noch nicht entwickelten Uranvorkommens, der Cigar Lake-Mine in der kanadischen Provinz Saskatchewan, wird laufend verschoben. Neueste Schätzungen lauten nun auf Mitte 2013. Bis dahin ist noch viel Zeit für den Uranpreis, um neue Höhen zu erklimmen.
Die restlichen 40 Prozent müssen über Lagerbestände abgedeckt werden. Diese stammen beispielsweise aus nach dem Ende des Kalten Krieges auseinander genommene russische Atomsprengköpfe und schwinden rapide. Dieses "Importabkommen" mit Russland endet jedoch Ende 2013.
Gleichzeitig steigt die Nachfrage aber immer weiter - durch höheren Verbrauch aber vor allem durch den Bau neuer Kernkraftwerke. So haben erst Ende Oktober Russland und die Ukraine den Bau einer neuen Uran-Anreicherungsanlage beschlossen. In China wird derzeit sogar an mehr als 20 neuen AKWs gebaut. Bis zum Jahr 2020 sollen aus den momentan 8,6 Gigawatt, die in 11 Reaktoren produziert werden, 70 Gigawatt in 50 Reaktoren werden. Auch in Indien ist der Bau neuer AKWs geplant.
Das heißt: Fundamental stehen die Zeichen weiter auf Sturm. Die Nachfrage übersteigt das Angebot nachhaltig. Weiter steigende Preise sind aus fundamentalen Gesichtspunkten fast unausweichlich."
Signal StockScore 98
Sentiment StockScore 75
"Jährlich werden weltweit mehr als fünfzehn Millionen Tonnen des roten Metalls neu aus Erz gewonnen. Die bedeutendsten Kupfererzvorkommen liegen heute in Chile und in den USA, wo 20 Prozent der bekannten Weltreserven lagern. Weitere wichtige Fördergebiete sind Afrika, Australien, China, Kanada, Indonesien, Südamerika, Russland und Polen.
Kupfer ist das erste Metall der Menschheit und wurde bereits vor über 10.000 Jahren in der Steinzeit verwendet. Im Laufe der Jahrhunderte lernten die Menschen dann immer besser mit dem Metall umzugehen und es auf vielfältigste Weise zu behandeln - etwa durch Hämmern, Erhitzen, Gießen oder das Vermischen (Legieren) mit anderen Metallen wie Blei, Silber, Zink oder Zinn. Die Entdeckung, dass Kupfer und Zinn gut zu verbinden sind, gab sogar einer ganzen Epoche ihren Namen: der Bronzezeit.
Kupfer hat eine hervorragende Wärme- und elektrische Leitfähigkeit und ist sehr beständig. Kupfer ist ein relativ weiches und dehnbares, aber auch widerstandsfähiges Metall, das sich gut verarbeiten und formen lässt.
Rund 40 Prozent aller Kupferanwendungen findet man heute übrigens im Bausektor, sowohl in der Elektro- als auch in der Sanitärinstallation. Ein weiterer bedeutender Einsatzbereich ist die Elektrotechnik. Dazu kommen zahllose Kupferlegierungen, von denen insbesondere Messing und Bronze im architektonischen Bereich immer stärker eingesetzt werden.
Aber auch in neuen Technologien ist Kupfer unersetzbar. Ob im neuen Siliziumcomputerchip oder in modernen Schienenfahrzeugen - Kupfer findet man überall dort, wo ein zuverlässiger High-Tech-Werkstoff gefordert ist.
Aufgrund der interessanten Geschichte und der Unerläßlichkeit dieses Rohstoffs, möchte ich euch einen Info-Thread bieten bei dem sich alles rund um den Rohstoff Kupfer, News, Explorer und seine Produzenten dreht.
Copper charts and informations
http://www.basemetals.com/?tab=2&lang=EN "
Das heißt noch für das Jahr 2020 wird mit Preise von 3 $/Pfund. Das sind bei 450 Mio Pfund immerhin einen kleinen Unterschied von über 300 Mio $.