TOURNIGAN! Es ist SOWEIT
Last Trade: 19 Apr 2006 15:59 EDT | |||
Last Traded | 2.760 | Net Change | +0.060 |
Last Bid Size | 77 | Volume | 895,420 |
Last Bid Price | 2.720 | Open | 2.760 |
Last Ask Price | 2.760 | High | 2.800 |
Last Ask Size | 2 | Low | 2.680 |
|
|
bis zum alten ATH von 850usd/unze haben wir noch ein bisschen,
wo mag dann wohl der kurs von TVC stehen? :-)
war der rutsch beim gold von 645 auf 610 usd..siehe realtime chart #477
ebenso hatte der rasante anstieg des goldes in den letzten wochen
tournigan und andere goldwerte weiter "explodieren" lassen.
wie schon geschrieben bis 850 usd/unze kann es erst einmal noch laufen....
Tournigan Files Jahodna Uranium Resource Estimate Report
Thursday April 20, 10:53 pm ET
VANCOUVER, BC--(MARKET WIRE)--Apr 20, 2006 -- Tournigan Gold Corporation (TSX VENTURE:TVC.V - News) is pleased to announce that it has filed a new Technical Report on the Jahodna uranium project in Slovakia. The Technical Report provides confirmation in accordance to National Instrument 43-101 of Jahodna's historical uranium resource at a significantly higher grade and provides a basis for preliminary economic modeling, which is almost complete. The Inferred Resource is comprised of 18.1 million lbs of U3O8 from 1.26 million tonnes, grading 0.66 percent U3O8, at a cut-off of 0.035 percent.
Jahodna Uranium Deposit
Cut-off Grade Uranium Tonnes Uranium
(% U3O8 ) % U3O8 lbs U3O8
Inferred Resources
0.035% 0.66 1,256,088 18,184,125
Jahodna is a high-grade uranium deposit in eastern Slovakia, discovered by the former Socialist government in 1985. Tournigan acquired Jahodna by applying for an exploration licence covering the deposit, which was granted in June 2005. ACA Howe International Ltd. was commissioned to produce a resource estimate for the Jahodna uranium project, as a prelude to ACA Howe completing a Preliminary Assessment of the potential economics. The estimate is dated March 28, 2006 and was prepared under the direction of David Pelham, Associate Consulting Geologist of ACA Howe and an Independent Qualified Person as defined by NI 43-101. The estimate included results from the 3 confirmatory diamond holes drilled by Tournigan in late 2005 and 13 relevant holes of the 52 historical diamond drill holes drilled by previous government operators, as discussed in Tournigan's March 6, 2006 release.
ACA Howe utilized MicroMine(TM) software to produce a Polygonal Wireframe Resource Estimate for Jahodna, utilising the same cut-off grade of 0.030% uranium metal (equivalent to 0.035% uranium oxide) as was used to calculate the higher-grade portion of the historical resource estimate. Geochemical analyses of Tournigan drill core confirmed historic and current radiometric drill logging results, which, in conjunction with general agreement of historic and current resource estimates, confirms historical results, in the opinion of ACA Howe and is in accordance with NI 43-101 standards.
The Jahodna uranium deposit is part of a belt of largely stratabound uranium-molybdenum deposits hosted in a sequence of Permian-age meta-volcanic/sedimentary rocks in eastern Slovakia. The Jahodna deposit is partially blind and is covered by thick soils and extensive forest cover. The deposit has a NW-SE strike, and a variably steep-moderate SW dip (60 deg. in the upper part, 47 deg. in the lower part). The overall dimensions of the main deposit established to date by drilling are approximately 500 metres along strike by 500 metres down-dip by 2.5 metres thick.
The almost-complete Preliminary Assessment at Jahodna is based on an underground mining plan, and should be released within the next week. Further in-fill and step-out drilling at Jahodna is scheduled to begin on May 8th, once ground conditions improve enough for heavy drilling equipment to be moved on unpaved forestry roads.
Tournigan Gold is focused on developing advanced projects in Europe -- Kremnica (gold) and Jahodna (uranium/molybdenum) in Slovakia, and Curraghinalt (gold) in Northern Ireland. Tournigan's asset mix also includes a portfolio of uranium properties in Wyoming and South Dakota, as well as VMS projects in Slovakia and Northern Ireland.
TOURNIGAN GOLD CORPORATION
"James Walchuck"
James Walchuck, President and CEO
Dr. Kent Ausburn, VP Exploration, Tournigan Gold, is the Qualified Person for both the Jahodna uranium project and the Kremnica gold project and approved the technical information herein
Last Trade: 21 Apr 2006 15:59 EDT | |||
Last Traded | 2.700 | Net Change | +0.100 |
Last Bid Size | 2 | Volume | 434,370 |
Last Bid Price | 2.670 | Open | 2.630 |
Last Ask Price | 2.700 | High | 2.700 |
Last Ask Size | 3 | Low | 2.600 |
Click here for the Delayed Market Depth by Price Summary for this symbol |
|
|
BEWEGENDE NEWS gibt es bei
Tournigan Gold, Frankfurt 898464
www.tournigan.com
Heute gibt das Unternehmen in Form Unternehmensmeldung einen echten Meilenstein bekannt. Die bisher nur nach slowakischem Standard eingeschätzten Uranressourcen auf der Jahodna-Lagerstätte in der Slowakei wurden nach kanadischem NI-43-101 Standard bestätigt. Das ist für die kanadischen Anleger ein wichtiger Schritt und Tournigan reiht sich mit dieser Schätzung in die Riege der ganz großen Uranexplorer ein!
Lesen Sie hier die News im Original.
18 Millionen Pfund Uran...
repräsentieren derzeit einen Wert von 738 Millionen USD. Gewaltig, wenn man bedenkt, dass Tournigan lediglich mit einer Marktkapitalisierung von rund 200 Millionen CAD notiert und über ein Barvermögen von rund 50 Millionen CAD verfügt! Nicht zu vergessen sind die rund 1 Million Unzen Gold, die ihrerseits einen Nettowert von rund 650 Millionen bedeuten.
Sie sehen, Sie können einen Milliardenwert zum Diskontpreis erwerben!
Wir sind stolz...
...dass wir Tournigan bei einem Preis von 0,43 unseren Hotlineanrufern empfohlen haben. Denn die aktuelle Performance von rund +330% sucht in der Börsenbrieflandschaft sicherlich ihresgleichen!
Tournigan ist in Kanada der Liebling der Anleger, dies beweist der konstant hohe Umsatz und die kontinuierliche Kurssteigerung!
Nutzen Sie den Drive, den diese Aktie hat und profitieren sie vom Uranboom! Tournigan wird zu den Gewinnern in der Explorationsszene 2006 gehören!
http://biz.yahoo.com/iw/060427/0125481.html
Bin schon länger bei TVC dabei und habe kein SL gesetzt, heute freut´s mich.
Hier nochmal die "news", die aber so überraschend doch nicht ist.
Tournigan Receives Positive Jahodna Uranium Economic Study
Thursday April 27, 9:00 am ET
VANCOUVER, BC--(MARKET WIRE)--Apr 27, 2006 -- Tournigan Gold Corporation (TSX VENTURE:TVC.V - News) is pleased to announce that an independent Preliminary Assessment has been received for the Jahodna uranium project in Slovakia. This Assessment provides conceptual economic parameters for a future uranium mine at Jahodna, including an internal rate of return of 44% after-tax, using a uranium oxide price of US$35 per pound. This is based on the Jahodna Inferred Resource estimate of 18.2 million pounds of uranium oxide from 1,256,000 tonnes grading 0.66% U3O8 (announced March 6, 2006) and does not include any possible future molybdenum by-product credit. The 5,000-metre phase 1 in-fill and step-out diamond drilling program at Jahodna is scheduled to begin May 8th, once ground and access conditions have improved.
ADVERTISEMENT
[0]
ACA Howe International was commissioned to complete a Preliminary Assessment on the Jahodna resource located in eastern Slovakia. Modeling an underground mining operation, ACA Howe has based their study on the Jahodna Inferred Resource (see Tournigan's March 6 or April 20, 2006 release). An initial mining rate of 100,000 tonnes per year by the undercut and fill mining method was assumed as a base case. Tournigan will be assessing options to increase the mining rate, should the exploration program at Jahodna successfully increase the resource base.
ACA Howe derived a direct operating and processing cost of US$92.50 per tonne of ore, consisting of mining direct costs of US$43 per tonne and process costs of US$45 per tonne, with US$4.5 per tonne for management overhead. This translates to US$9.15 per pound of uranium oxide produced, before any molybdenum by-product credit. The capital cost of building the mine and plant, including the acquisition of all operating equipment is US$29.4 million. With no depreciation allowance, capital payback would occur in 25 months, on an after-tax basis. The after-tax Net Present Value of the uranium-only project at an 8% discount rate is $63.5 million. Note that the capital and operating costs include items for extracting molybdenum as a byproduct, though no molybdenum revenue has been included in the projected cash flow. Molybdenum revenue will be included in future economic models if and when enough verifiable molybdenum data is available to be able to estimate at least an Inferred Resource for molybdenum.
The relatively high mining cost is the result of using paste fill, designed to put a portion of waste rock back underground and providing extra safety for miners and reducing the environmental impact. Also, the mine has been designed with a robust ventilation system providing treatment of the exhaust air before returning to the atmosphere. Again, this will assist in workplace safety and environmental stewardship.
The production estimate is based on processing of the ore by the traditional carbonate leach method which normally results in extraction of approximately 90% of both U3O8 and MoS2, if further testwork confirms that molybdenum occurs in economic concentrations. The financial model uses 85% metallurgical recoveries to be conservative. The mine life, based solely on the current resource, would be 10 years. When in normal production, the mine and plant are forecasted to produce and treat 100,000 tonnes per year (tpa) of ore at a mill grade of 0.45% U metal (or 0.53% U3O8). This grade includes 5% for dilution. Production of uranium in yellowcake is forecasted to be approximately 990,000 pounds per year.
Note that this Preliminary Assessment is by definition preliminary in nature and is based on an Inferred Resource that is currently considered too speculative geologically to have the economic considerations applied to it that would enable it to be categorized as a Mineral Reserve, according to CIM Definition Standards. Generally, an economic evaluation would only be completed on Measured and Indicated Resources, and there is no certainty that this preliminary assessment will be realized.
Tournigan will utilize this Preliminary Assessment to guide future work at Jahodna. Further metallurgical test work will be initiated to better-define the process flow sheet. Additional environmental work is planned. Tournigan is committed to reducing environmental impacts.
Further details of the Preliminary Assessment can be found in a National Instrument 43-101 Technical Report that will be filed on SEDAR shortly (www.sedar.com).
David Pelham, Senior Geologist of ACA Howe International Ltd., an Independent Qualified Person as defined by National Instrument 43-101 supervised the preparation of the Preliminary Assessment, and has reviewed the technical information disclosed in this news release.
Tournigan Gold is focused on developing advanced projects in Europe - Kremnica (gold) and Jahodna (uranium/molybdenum) in Slovakia, and Curraghinalt (gold) in Northern Ireland. Tournigan's asset mix also includes a portfolio of uranium properties in Wyoming and South Dakota, as well as VMS projects in Slovakia and Northern Ireland.
netter handel heute, anfangs haben mini umsätze und ausschläge beim goldkurs, tvc auf 2,25 cad runtergezogen, anschließen ging die kursrally dann bis zum neuen ATH von 2,85cad in die umgekehrte richtung weiter, in frankfurt hatten ein paar kalte füße bekommen und im bereich 1,59€ größere blöcke geschmissen, danach gings dann auch an der fse bis 2,00€ hoch.´
Last Trade: 27 Apr 2006 15:58 EDT | |||
Last Traded | 2.770 | Net Change | +0.210 |
Last Bid Size | 26 | Volume | 1,587,669 |
Last Bid Price | 2.770 | Open | 2.550 |
Last Ask Price | 2.850 | High | 2.850 |
Last Ask Size | 14 | Low | 2.240 |
Click here for the Delayed Market Depth by Price Summary for this symbol |
|
|
Hätte ich bei so einem ehemaligem Penny-Stock-Wert gar nicht erwartet. Jedoch gibts ja auch nicht viel zu meckern wenn der Kurs seit Monaten nach oben geht.
Trotzdem mal ein Danke an alle Beteiligten !!
Was glaubt Ihr, wann die s.g. Analyten den Wert mal wieder "einschätzen" und Tournagan noch mehr Aufmerksamkeit erlangt ?
gruss
EsistJazz
Also wenn der Goldpreis noch hoch auf 800 bis 1000 geht, dann ist Tournigan bald bei 3,50.
Was denkt Ihr???
Last Trade: 01 May 2006 15:31 EDT | |||
Last Traded | 3.120 | Net Change | +0.100 |
Last Bid Size | 209 | Volume | 717,075 |
Last Bid Price | 3.050 | Open | 3.080 |
Last Ask Price | 3.120 | High | 3.250 |
Last Ask Size | 79 | Low | 3.020 |
Click here for the Delayed Market Depth by Price Summary for this symbol |
|
|
die vorhandenen Ressourcen die uns reicher machen werden.
Da muss man für seine 500 Prozent auch dann 5 Jahre warten.
Na und ? Bei der Sparkase bekomme ich 4,25.
#27847 von Frickhasserin 02.05.06 15:53:38 Beitrag Nr.: 21.403.450 Dieses Posting: versenden | melden | drucken | Antwort schreiben | TOURNIGAN GOLD CORP | ||
was noch keiner weiss |
#27848 von Frickhasserin 02.05.06 15:55:25 Beitrag Nr.: 21.403.486 Dieses Posting: versenden | melden | drucken | Antwort schreiben | TOURNIGAN GOLD CORP | ||
Sprott wird in Kürze sein Kursziel für Tournigan massiv anheben auf 4,40 CAD (3,12 Euro) Laut BV wurde bisher JEDES Kursziel von Sprott in kurzer Zeit erreicht UND weitere Uranakquisitionen in Aussicht |
#27849 von leinad.w 02.05.06 15:56:07 Beitrag Nr.: 21.403.503 Dieses Posting: versenden | melden | drucken | Antwort schreiben | TOURNIGAN GOLD CORP | ||
NEUE HOTLINE + GEHEIMINFORMATIONEN PARAMOUNT UND TOURNIGAN Sehr geehrte Abonnenten, ab sofort gibt es unsere neue 1000%-Empfehlung, die Sie unbedingt noch heute in Ihrem Depot haben sollten plus zusätzliche aufmerksam Geheiminformationen zu Paramount Gold aufmerksam und Tournigan Gold. Rufen Sie jetzt an: bullVestor Hotline Deutschland 0900 - 11 080 119 (1,99 €/Min.) bullVestor Hotline Österreich 0900 - 51 08 33 (2,17 €/Min.) bullVestor Hotline Schweiz 0901 - 90 08 04 (3,13 SFR/Min.) (aus dem Festnetz des jeweiligen Landes) Mit besten Empfehlungen Ihr Team vom bullVestor |