Forsys vor MEGEHYPE !!


Seite 1 von 5
Neuester Beitrag: 26.03.09 14:09
Eröffnet am:23.03.06 17:53von: Kumpel34Anzahl Beiträge:105
Neuester Beitrag:26.03.09 14:09von: tomixLeser gesamt:29.893
Forum:Hot-Stocks Leser heute:23
Bewertet mit:
8


 
Seite: <
| 2 | 3 | 4 | 5 5  >  

5 Postings, 6849 Tage Kumpel34Forsys vor MEGEHYPE !!

 
  
    #1
8
23.03.06 17:53
Hi vor 2 Wochen hat der erfolgreiche Börsenbrief www.milliondollartrader.de FORSS empfholen bei 77Cent jetzt schon 1,40 !!!Der Hyper um die Uran Perle wird aber weiter gehen! genau sop wie der Hype um Uranium Power die vor 3 wochen empfohlen wurden und auch schon 60% seit dem geklettert sind!!

aber gestern kam die neue Empfehlung!!! Es geht um die alte Perle SEAMLESS WIFI!!! DIE VOR EINER NEUBERTUNG STEHT!!! Positive News kamen schon und das Kursziel vom Brief ist------->>>>>0,05<------ DAS SIND SATTE 100% auf einen kurzen ZEITRAUM!!!



ALSO JUNGS ICH BIN POSITIONIER BIS DENNE MFG MARTIN  

553 Postings, 8857 Tage WALLOheute gigantischer Umsatz in FORSYS

 
  
    #2
23.03.06 20:34
diese URAN-Aktie könnte schnell Richtung 2 EURO schießen  

720 Postings, 6917 Tage Nr66n-tv

 
  
    #3
23.03.06 20:41
siehe Uranaktie 1€ KZ4€  

553 Postings, 8857 Tage WALLOvorbörslich schon Kurse gestellt von

 
  
    #4
24.03.06 08:55
1,40 zu 1,50 in Stuttgart  

33124 Postings, 7121 Tage Terminator100wallo wie kommst denn darauf ?? o. T.

 
  
    #5
24.03.06 09:27

7765 Postings, 6880 Tage polo104 €

 
  
    #6
24.03.06 10:43
Kursziel: 4 €  

804 Postings, 6880 Tage CincinnatiFrage

 
  
    #7
24.03.06 11:06


was bedeutet denn
MEGEHYPE ???

danke  

553 Postings, 8857 Tage WALLOMEGAHYPE = Höhenflug

 
  
    #8
27.03.06 14:03
heute knacken wir die 2 CAN$ Marke  

553 Postings, 8857 Tage WALLOForsys übersteigt erstmals 1,50 EURO

 
  
    #9
27.03.06 15:17
entspricht ca. 2,10 CAD$

längerfristiges Ziel 3 - 4 EURO bei weiter steigenden URANpreisen ist durchaus noch mehr drin  

7765 Postings, 6880 Tage polo101.73 €

 
  
    #10
28.03.06 08:35
Macht bei 1.73 € auf, und wieder mal 10 % !  

553 Postings, 8857 Tage WALLOHoch in Kanada war gestern bei

 
  
    #11
28.03.06 08:47
2,60 CAN$ = ca. 1,86 EURO
die Rally läuft weiter  

553 Postings, 8857 Tage WALLOKaufinteresse ungebrochen - nichts verkaufen es

 
  
    #12
28.03.06 09:56
geht kurzfristig noch weiter nach oben Richtung 2 EURO  

804 Postings, 6880 Tage Cincinnatiwieso

 
  
    #13
28.03.06 11:35
.. wieso ?? kurzfristig ???  

553 Postings, 8857 Tage WALLOrechne damit dass spätestens bei 2,99 CAN$

 
  
    #14
28.03.06 14:53
stärkere Gewinnmitnahmen einsetzen werden,daher kurzfristig  

1 Posting, 6814 Tage cashmonkeyja...wo sind sie denn...

 
  
    #15
05.04.06 16:57
...alle forsys-investierten. keiner sagt mehr was, ist das ein gutes zeichen? sind schon alle ausgestiegen???  

249 Postings, 6830 Tage kikerikibin noch dabei

 
  
    #16
05.04.06 22:25
und suche nach Neuigkeiten, finde aber nichts.

Wie geht es weiter?  

804 Postings, 6880 Tage CincinnatiForsys metals

 
  
    #17
2
05.04.06 23:24
.. ein ganz klarer kauf .....
kaufen und abwarten und .....

ich kann euch diese aktie nur empfehlen ..


euer schleimig schwänzelnder
>>>>>>>>>>  
Angehängte Grafik:
Cincinnati.gif
Cincinnati.gif

6 Postings, 6805 Tage balu_forumEs geht Richtung Norden Heute bereits plus 10 Prozent o. T.

 
  
    #18
13.04.06 11:55

27 Postings, 6855 Tage MercedesBenzBin seit 5 Tagen dabei o.T. 1.72

 
  
    #19
13.04.06 14:23
Und denke nicht an den Verkauf! 2.5 € Kurse locker!!

Was war heute der Grund för die hohen Zukäufe. News, Börsenbrief?  

6 Postings, 6805 Tage balu_forumKurzfristig bei 2,5 Langfristig bei 4 Euro

 
  
    #20
13.04.06 14:34
die einzigen News die ich entdeckt habe sind bereits 2 Tage alt ->

http://forsysmetals.de/public/...1&mid=4120&a=300&sc=&y=6013&&offset=  

6 Postings, 6805 Tage balu_forumKurs in Toronto 2,68 CAD = 1,925 Euro es geht weiter o. T.

 
  
    #21
13.04.06 16:05

673 Postings, 6864 Tage flakaNews von Forsys

 
  
    #22
29.05.06 18:11
Forsys Begins Detailed Drilling for Measured Resource at Valencia
Monday May 29, 9:00 am ET

TORONTO, ONTARIO--(CCNMatthews - May 29, 2006) - Forsys Metals Corp ( "Forsys" or the "Company")(TSX VENTURE:FSY - News) is pleased to report the start of a reverse circulation drill hole program ("RC Program") in the central portion of the Company's Valencia Uranium Deposit ("Valencia"), located in Namibia, Africa. With the assistance of Snowden Mining Industry Consultants ("Snowden"), a detailed plan of close spaced RC drill holes will be used to re-classify a portion the known Valencia resource currently categorized as "Measured." This measured portion will be used in the Company's Valencia Feasibility Study.

ADVERTISEMENT
The RC Program will include drilling on a 20 by 20 metre grid with drill hole depths varied to accommodate the topography. The result will be a measured block of approximately 7-10 Mt representing a minimum of 70% of two years production from a proposed Valencia open pit operation.

The RC Program will collect approximately 2500 samples. The analytical results for uranium (U3O8) along with the calculation of acid consumption rates (calc-index) will be reported periodically over the next three to four months. Acid consumption rates will assist with engineering and processing studies.

Core samples were also collected for metallurgical studies; initially these studies will focus on rock strength properties. The metallurgical results are expected within six weeks.

In addition to the RC program, two diamond drill rigs are presently finishing off the validation, resource delineation and infill program at Valencia. Three additional short drill holes were requested by Snowden to collect further geotechnical information for the pit optimization studies. In total six holes remain to be drilled.

A significant number of core samples are also in various stages of the uranium assay cycle and their results will continue to be reported following receipt in Windhoek, Namibia.

Rick Bonner, P. Geol., Exploration Manager of Forsys, is the designated Qualified Person responsible for all of Forsys' exploration programs as well as the person responsible for the contents of this news release.  

673 Postings, 6864 Tage flakaNews

 
  
    #23
05.07.06 20:09
Forsys Reports Additional High Grade Uranium Intersections At Valencia
Wednesday July 5, 12:36 pm ET

TORONTO, ONTARIO--(CCNMatthews - July 5, 2006) - Forsys Metals Corp ("Forsys" or the "Company") (TSX VENTURE:FSY - News) is pleased to report analytical results for three re-sampled historical drill holes; VA26-088, -096 and -102 and Forsys geotechnical drill hole VA26-117, all from the Company's Valencia Uranium deposit ("Valencia"), located in Namibia. Valencia has an initial National Instrument 43-101 ("NI 43-101") compliant resource of 32 million tonnes grading 0.22 kg/t U3O8 (Greenway 2005) and is located 35 km east of Rio Tinto's operating Rossing Uranium mine.

ADVERTISEMENT
The original analytical data and geological logs for the three re-sampled historical drill holes were reported as missing from the historical drill hole data base and were therefore not included in the NI 43-101 resource calculation. The three historical holes reported here, along with the previously reported historical holes, are located within the central area of the Valencia Main Zone. These results, together with the Company's previously released results, serve to continue to build management's confidence in the Valencia resource.

Drill hole VA26-088 intersected a thick zone of uranium mineralization in the northern central portion of the deposit:

- 26.47 m grading 0.214 kg/t U3O8 from 90.64 m to 117.11 m.

(Including 3.01 m grading 0.531 kg/t U3O8)

Drill hole VA26-096 intersected a broad zone of uranium mineralization near the centre of the deposit:

- 40.48 m grading 0.414 kg/t U3O8 from 219.55 m to 260.79 m.

(Including 1.47 m grading 1.099 kg/t U3O8) and

(Including 3.91 m grading 1.106 kg/t U3O8)

Drill hole VA26-102 intersected two separate zones of uranium mineralization on the northern margin of the deposit:

- 4.40 m grading 0.226 kg/t U3O8 from 36.40 m to 40.80 m.

- 10.35 m grading 0.210 kg/t U3O8 from 138.40 m to 148.75 m.

Drill hole VA26-117 intersected a zone of uranium mineralization on the southern margin of the deposit:

- 6.03 m grading 0.257 kg/t U3O8 from 221.8 m to 227.83m.

VA26-117 was a geotechnical hole designed to test the south-eastern wall of the expected pit design and is an apparent width from the off-section hole.

In addition, the "measured block" reverse circulation ("RC") drilling program is progressing well having completed 31 holes (2434.5 m) of a scheduled 160 holes. A second RC drilling rig is scheduled to arrive on site shortly to increase drilling rates and help accelerate this portion of the Feasibility Study measurement program.

Results of both the diamond drilling and RC drilling programs will be reported as the results are received.

Rick Bonner, P. Geol., Exploration Manager of Forsys, is the designated Qualified Person responsible for all of Forsys' exploration programs as well as the person responsible for the contents of this news release.

Shares Outstanding: 46,920,068

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

 

220 Postings, 6863 Tage oelbaronNeue, gute Uranwerte

 
  
    #24
06.07.06 11:43
Forsys Reports Additional High Grade Uranium Intersections at Valencia
Jul 05, 2006 12:59
 

720 Postings, 6917 Tage Nr66Rt bitte! o. T.

 
  
    #25
06.07.06 12:03

Seite: <
| 2 | 3 | 4 | 5 5  >  
   Antwort einfügen - nach oben