Da geht bald die Post ab WKN: 898464


Seite 25 von 35
Neuester Beitrag: 12.04.12 18:44
Eröffnet am:14.07.03 11:03von: TamerBAnzahl Beiträge:869
Neuester Beitrag:12.04.12 18:44von: .JuergenLeser gesamt:99.748
Forum:Hot-Stocks Leser heute:30
Bewertet mit:
6


 
Seite: < 1 | ... | 22 | 23 | 24 |
| 26 | 27 | 28 | ... 35  >  

885 Postings, 7902 Tage QADSANHoch gehts!

 
  
    #601
02.03.04 02:00
0,56

QADSAN  

1179 Postings, 7624 Tage redinochmal News für Tournigan Gold

 
  
    #602
16.03.04 09:09
Tournigan Gold Corporation ("Tournigan") has received an independent
scoping study for the Kremnica gold deposit in the Slovak Republic
which highlights the following:

- Increase in Mineable Ounces
- Lower Strip Ratio
- Larger Net Present Value
- Rapid Capital Payback

The scoping study projects average annual production of 89,324 ounces
of gold equivalent per year over 10 years at an operating cost of
US$189 per ounce. The Net Present Value of the Sturec deposit at
Kremnica using a 5% discount rate is Can$62 million, after-tax, which
translates to Can$1.77 per Tournigan share (on an issued and
outstanding basis).

The Scoping Study Update

Beacon Hill Consultants (1988) Ltd. were engaged to update and upgrade
a scoping study completed by them in 1998 on Kremnica, utilizing the
re-calculated resource estimate from the NI 43-101 Technical Report
(see Tournigan's press release dated Feb. 11, 2004) . This scoping
study, like the Technical Report, focused exclusively on the Sturec
Zone. A new optimized pit was produced which resulted in a conceptual
mineable resource at Sturec as follows:

--------------------------------------------------
Grade, Gold Feed Mineable Strip
equiv. (g/t) Tonnes Ounces Ratio
--------------------------------------------------
Beacon Hill 2004 study 2.055 15,340,000 868,504 1.93
Improvement* +9% +36% +34% -20%
--------------------------------------------------
* Compared to 1998 pit design by Western Services Engineering

The pit was optimized using a 3D Lerch-Grossman routine, using 50
degree pit slopes as before, and metal prices of US$385 per ounce of
gold and US$5.50 per ounce of silver. A production rate of 4,500
tonnes per day was used to balance efficiencies of scale with a mine
life of 10 years (based on current resources defined at Sturec). The
proposed plant facility is situated within the existing Kremnica Mining
Licence, which is wholly-owned by Tournigan Gold.

Costs were updated and made more precise, especially electrical power.
The result is operating costs of $11 per tonne of ore, or US$194 per
ounce of gold (including silver credit) which compares to the previous
cost estimate in 1998 of US$190 per ounce. The capital cost is
estimated to be US$48.9 million, including contingencies of 10 to 30%.
Capital expenditures can be paid back in 2.6 years on an after-tax
basis and the base case Internal Rate of Return increases to 26% from
13% in the earlier study. Beacon Hill utilized the same metal recovery
estimates of 92% for gold and 72% for silver, based on two
metallurgical studies authored by Hazen Research Inc in 1997 and 1998.

Tournigan is extremely pleased with these results, which represent a
substantial enhancement to the Kremnica project since its purchase in
July 2003. This improved economic estimate, combined with the increase
in both grade and the proportion of "Indicated" resources at Sturec
demonstrate even greater value for Kremnica. Tournigan will continue
to add value by implementing Beacon Hill's recommended work program to
further develop the project, including 5,600 metres of drilling in
2004. The drill program will not only focus on further upgrading
resources at Sturec, but will also focus on expanding the historical
resources at the Wolf and Vratislav zones on-strike to the north, and
test large-scale exploration targets at Kremnica South. Any
improvements to resources or grade from these three zones could further
improve the economics. Tournigan will also initiate the recommended
additional studies on environmental permitting, metallurgy,
socio-economic and tailings, to run concurrently. There are also a
number of optimizations to investigate, which could reduce both capital
and operating costs.

It should be noted that this conceptual mineable resource used in the
scoping study includes "Inferred" resources that are currently
considered too speculative geologically to have the economic
considerations applied to them that would enable them to be categorized
as mineral reserves. The "Inferred" resources have only been included
to determine the potential viability of the project, on which a
decision has been made to initiate further development work.
Generally, an economic evaluation would only be completed on "Measured"
and "Indicated" resources, and there is no certainty that this
preliminary assessment will be realized.

Tournigan Gold is focused on developing two advanced gold projects in
Europe - Curraghinalt in Northern Ireland and Kremnica in Slovakia.
Feasibility drilling at Curraghinalt is nearing completion with the
final feasibility study to be completed by the fourth quarter of 2004.
Kremnica will be the focus of exploration and development work in 2004,
with feasibility studies expected to be completed during the third
quarter 2005.

TOURNIGAN GOLD CORPORATION

"Damien Reynolds"
Damien Reynolds, President and Chief Executive Officer


The TSX Venture Exchange has not reviewed and does not accept
responsibility for the adequacy or accuracy of this release. Statements
in this press release other than purely historical information,
including statements relating to the Company's future plans and
objectives or expected results, constitute forward-looking statements.
Forward-looking statements are based on numerous assumptions and are
subject to all of the risks and uncertainties inherent in the Company's
business, including risks inherent in mineral exploration and
development. As a result, actual results may vary materially from
those described in the forward-looking statements.


For further information please contact:
Damien Reynolds, President Tel: (604) 683-8320
Garry Stock, Executive VP Tel: (604) 683-8320
www.tournigan.com

==================================================
Copyright (c) 2004 TOURNIGAN GOLD CORPORATION (TSXV-TVC) All rights
reserved. For more information visit our website at
http://www.tournigan.com/ or send mailto:info@tournigan.com
Message sent on Mon Mar 15, 2004 at 6:27:15 PM Pacific Time


Business Wire
Tournigan Gold Corporation: Goldeinschlüsse mit hohem Vorkommen in Curraghinalt
Montag 16. Februar 2004, 13:29 Uhr



VANCOUVER, British Columbia--(BUSINESS WIRE)--16. Feb. 2004--Die Tournigan Gold Corporation ("Tournigan") ist während der jüngsten Testbohrung im Curraghinalt-Goldprojekt in Nordirland in zwei Diamantbohrlöchern auf Erzadern mit hohem Goldvorkommen gestoßen. Bohrung CT-13 ergab Testwerte von 68,07 Gramm Gold pro Tonne (g/t) über 3,43 Meter, u.a. 183,23 g Gold/t über 1,26 Meter, während CT-14 42,66 g/t über 4,06 Meter ergab, einschließlich 103,22 g Gold/t über 1,55 Meter. CT-12 umfasste außerdem eine Anzeige

Ader von 57,16 g Gold/t über 1,92 Meter in einer benachbarten Erzader. Diese Abschnitte befinden sich in geringer Tiefe und wobei die genaue Tiefe der Erzeinschlüsse unbekannt ist. Dieses Gebiet mit hohen Vorkommen ist für Startbohrungen leicht zugänglich und bergen daher hohes Profitpotenzial.
Diese Bohrungen bilden Teil der aktuellen Testbohrungen von Tournigan in Curraghinalt als Ausgangpunkt zur Untersuchung der Wirtschaftlichkeit und Produktionsmöglichkeiten. Die Ergebnisse sind wie folgt:


--------------------------------------------------

Gramm Bohrloch Von - bis Länge per Tonne Ader

(Meter) (Meter) gold


--------------------------------------------------

CT-12 20,37 - 22,29 1,92 57,16 T17C

59,59 - 60,67 1,08 13,7 T11F

144,30 - 145,63 1,33 11,4 106/16


--------------------------------------------------

CT-13 39,59 - 43,02 3,43 68,07 T17 H/B einschließlich 39,59 - 40,85 1,26 183,23 "


--------------------------------------------------

CT-14 42,94 - 47,00 4,06 42,66 T17 H/B Einschließlich 44,69 - 47,00 2,32 71,61 "


--------------------------------------------------

Hinweis: Frühere Gutachten der Vorkommen in Curraghinalt gingen von einem Gold-Cut-Off-Gehalt von 6 g/t über eine Mindestschürfbreite von 1,25 Metern aus.

Die Testbohrungen zur Evaluierung der Wirtschaftlichkeit der Schürfungen in Curraghinalt schneiden jede Ader im Abstand von höchstens 30 Meter, um die Mineralvorkommen der Adern zu bestimmen und die Klassifizierung der Vorkommen in Curraghinalt entsprechend der Testbohrungen zu aktualisieren. Es wird erwartet, dass sich durch die obigen Ergebnisse und die Ergebnisse aus aktuellen Bohrungen nach Abschluss der Berechnung der Wirtschaftlichkeit eine signifikante Steigerung der Vorkommen ergibt. Der Erzeinschluss befindet sich unmittelbar über einer vorhandenen Begleitstrecke für Testschürfungen, d.h. es kann sofort mit dem Abbau begonnen werden, sobald die Produktion in Curraghinalt genehmigt worden ist. Dadurch sollten ausreichend Investitionen einfließen, um die Kapitalausgaben rasch decken zu können.

Die CT-13/CT-14-Erzader ist die Ader mit dem bisher höchsten Vorkommen in Curraghinalt, obgleich mindestens ein anderer Einschluss mit ähnlichen Vorkommen und Dicke entdeckt worden ist; während der Aushebung einer der Begleitstrecken für Testschürfungen sind Proben daraus entnommen worden (siehe Pressemitteilung von Tournigan vom 25. Juli 2003). Tournigan geht davon aus, dass im Laufe der Testbohrungen und Erkundungsschürfungen weitere Erzeinschlüsse mit hohem Vorkommen gefunden werden. Da sich diese Erzeinschlüsse im Adersystem von Curraghinalt wahrscheinlich wiederholen werden, werden sich die bereits jetzt schon starken, wirtschaftlichen Prognosen der Curraghinalt-Mine noch verbessern. Tournigans wachsende Kenntnisse über die Regelmäßigkeit und Kontinuität von Erzeinschlüssen mit mittlerem, hohem und sehr hohem Vorkommen sind ein ausgezeichneter Ausgangspunkt für weitere Erkundungen des Adersystems in Curraghinalt. Die Mineralienvorkommen sind derzeit mit einer Ausdehnung von mindestens 8 Kilometern verzeichnet und befinden sich im Bereich der aktuellen Schürflizenz von Tournigan befinden.

Tournigan wird die Testbohrungen in Curraghinalt demnächst mit weiteren 6 Bohrungen fortsetzen. Ein Gutachten dieser Arbeiten steht kurz vor dem Abschluss und stellt den Ausgangspunkt für Ausschreibungen für die Curraghinalt Environmental Impact Study dar. Tournigan möchte möglichst 2004 mit der Produktion in Curraghinalt beginnen.

Für 2004 plant Tournigan ferner ein Explorations- und Entwicklungsprojekt in beträchtlichem Umfang im Kremnica-Goldprojekt in der Slowakischen Republik. Wie bereits am 11. Februar berichtet, ermittelte ein Gutachten höhere Resourcen in Kremnica, d.h. mit einem Gold-Cut-Off von 1,0 g/t ergeben sich dort nun folgende Vorkommen:


--------------------------------------------------
Krem- Gold Silber Gold-Äq. nica Vork., Vork., Vork., Tonnen Unzen, Unzen, Unzen, Zone (g/t) (g/t) (g/t) Gold Silber Gold-Äq.
--------------------------------------------------
Sturec - Ange- zeigt 2,11 15,43 2,31 5.663.941 384.231 2.809.802 421.540 Sturec - Abge- leitet 2,01 16,06 2,22 8.367.508 540.733 4.320.487 596.968 Wolf 1,48 21,3 1,91 1.715.500 81.600 1.175.000 105.300 Vrati- slav 3,33 24,7 3,58 595.000 64.000 472.000 73.000
--------------------------------------------------

Tournigans Programm zur Qualitätssicherung/Qualitätskontrolle Tournigan hat für Bohrungen, die Entnahme von Gesteinsproben und Erd- und Sedimentproben ein Programm zur Qualitätssicherung/Qualitätskontrolle (QA/QC) implementiert, das auf alle geochemischen Probenentnahmen, den Probenversand und Probenanalyseverfahren angewandt wird. Die QA/QC-Verfahren umfassen ein Protokoll der "Chain of Custody" und die systematische Prüfung durch Leer- und Doppelproben. Die von Tournigan implementierten Tests bestehen aus vorläufigen und endgültigen Tests, die von den OMAC Laboratories in Irland durchgeführt werden, da keine wesentlichen Unterschiede aufgetreten sind. Der zuständige Experte für Curraghinalt ist Dr. Kent Ausburn - siehe Tournigans Pressemitteilung am 5. November 2003 für weitere Details. TOURNIGAN GOLD CORPORATION Damien E. Reynolds, Vorstandsvorsitzender

Aussagen in dieser Pressemitteilung, bei denen es sich nicht um rein historische Informationen handelt, einschließlich Aussagen in Bezug auf die Zukunftspläne und Ziele oder die erwarteten Ergebnisse des Unternehmens, sind zukunftsbezogene Aussagen. Als solche beruhen sie auf zahlreichen Annahmen und unterliegen allen Risiken und Unwägbarkeiten in Verbindung mit dem Geschäft des Unternehmens, einschließlich der Risiken in Verbindung mit Mineralienabbau und -entwicklung. Als Folge dieser Risiken können die tatsächlichen Ergebnisse wesentlich von den in den zukunftsbezogenen Aussagen Beschriebenen abweichen.

Die TSX Venture Exchange unternahm keine Prüfung der Adäquanz oder Genauigkeit dieser Pressemitteilung und übernimmt daher dafür keine Verantwortung.



--------------------------------------------------

Contact:
KONTAKT: Tournigan Gold Corporation
Damien Reynolds, +1 604-683-8320
oder
Tournigan Gold Corporation
Garry Stock, +1 604-683-8320
+1 604-683 8340 (FAX)
info@tournigan.com
www.tournigan.com



 

1179 Postings, 7624 Tage rediTournigan Gold NEWS!

 
  
    #603
22.03.04 09:11
Press Release Source: Tournigan Gold Corporation


Tournigan Hires Investor Relations Firm
Friday March 19, 4:07 pm ET


VANCOUVER, BRITISH COLUMBIA--Tournigan Gold Corporation ("Tournigan") has retained the European firm of Better Investment Group Communications ("B.I.G.") to conduct media awareness programs on behalf of Tournigan in Germany and throughout the European Union. B.I.G., through its principal Pascal Geraths, is an experienced and knowledgeable public relations firm in Europe, specializing in resource companies.
ADVERTISEMENT


Tournigan will pay to B.I.G. a monthly fee of $5,000 under the terms of a one-year service agreement (the "Service Agreement"). Mr. Geraths has also been granted an option to acquire 150,000 shares at $0.35 per share for a period of five years, vesting in equal quarterly stages over the first year. The Service Agreement is subject to approval by the Exchange.

Tournigan Gold is focused on developing two advanced gold projects in Europe - Curraghinalt in Northern Ireland and Kremnica in Slovakia. Feasibility drilling at Curraghinalt is nearing completion with the final feasibility study to be completed by the fourth quarter of 2004. Kremnica will be the focus of exploration and development work in 2004, with feasibility studies expected to be completed during the third quarter 2005.

TOURNIGAN GOLD CORPORATION

Damien Reynolds, President and Chief Executive Officer

Statements in this press release other than purely historical information, including statements relating to the Company's future plans and objectives or expected results, constitute forward-looking statements. Forward-looking statements are based on numerous assumptions and are subject to all of the risks and uncertainties inherent in the Company's business, including risks inherent in mineral exploration and development. As a result, actual results may vary materially from those described in the forward-looking statements.


--------------------------------------------------
Contact:

Tournigan Gold Corporation
Damien Reynolds
President
Phone: (604) 683-8320
or
Tournigan Gold Corporation
Garry Stock
Executive VP
Phone: (604) 683-8320
Fax: (604) 683-8340
Email: info@tournigan.com
Website: www.tournigan.com

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.



--------------------------------------------------
Source: Tournigan Gold Corporation  

1179 Postings, 7624 Tage redivorbörselich bid/ask 0.50$/0.50$ in Kanada o. T.

 
  
    #604
22.03.04 14:48
 

240 Postings, 7620 Tage player2Tournigan

 
  
    #605
22.03.04 15:41
ist seit einer Woche keinen Cent gestiegen, obwohl der POG seit 1 Woche um 20 USD gestiegen ist!Langsam finde ich das echt merkmürdig, auch wenn der Gesamtmarkt einen Teil zum Nichtanstieg beiträgt!  

2966 Postings, 8420 Tage TamerBich steig in acht monaten noch zu 0,29 cent ein

 
  
    #606
22.03.04 15:44
gute aktie doch zur zeit nichts zu holen  

240 Postings, 7620 Tage player2Da

 
  
    #607
22.03.04 15:50
hast du wirklich Recht!Die Phantasie ist aus dieser Aktie raus!Werde beim nächsten kleinen Anstieg alle Tournis verkaufen!Habe einfach kein Bock mehr!Gibt nach dem Kursverfall bessere Aktien, wie z.B. QSC!  

324 Postings, 7789 Tage KrabsDieses Gewechsel...

 
  
    #608
23.03.04 13:25
... bringt m.E. auch nicht mehr ein. Das beste ist sich Aktien zu kaufen von denen man langfristig überzeugt ist und dann einfach abwarten...

Kann schon mal ganz schnell gehen, ist aber nicht die Regel. Meist dauert es 1-3 Jahre. Dafür gibt es dann aber auch oft satte Gewinne. Warum sollte Tournigan schon jetzt steigen? Die Bohrergebnisse sind doch längst eingepreist... Erst wenn es mal losgeht mit der Förderung bekommt diese Aktie neuen Schwung (bzw. wenn genau feststeht wann es losgeht, denn die Börse nimmt ja bekanntlich alles vorweg...). Kurzfristig sehe ich nur durch Goldpreissteigerungen oder größere Einsteiger Potential...

Ihr habt zu wenig Geduld. Ich halte meine Tournigans fest!
Trotzdem viel Glück mit den anderen Werten. Wenn Sie super laufen, schaue ich neidisch rüber...  

240 Postings, 7620 Tage player2Das

 
  
    #609
23.03.04 13:39
heisst du willst jetzt mindestens 8 Monate warten, bis TVC mal wieder höher als 0,6 CAD steigt!Das finde ich ganz ehrlich gesagt zu lange!Denn in dieser Zeit kannst du mit deinem Geld bei anderen aktien mehr machen als bei TVC!Und dann spätestens im November wieder voll in TVC investieren!  

890 Postings, 8530 Tage canettisie dümpelt dahin diese aktie

 
  
    #610
23.03.04 16:42
warum sollte sie gerde in 1-2 jahren steigen?
die letzten news waren nicht so schlecht und haben leider nur ein kurzes kursfeuerwerk bewirkt. steigender goldpreis scheint die aktie nicht zu tangieren. warum also sollte sie gerade in 1-2 jahren steigen?  

324 Postings, 7789 Tage KrabsHab ich doch gesagt Canetti!

 
  
    #611
23.03.04 19:47
Weil es bei Tournigan letzten Endes um den Abbau von Gold geht! Bisher alles noch reine Theorie mit schönen Probeergebnissen. Die Kernfrage bei diesem Schuppen ist doch: Schaffen die es - am besten ohne weitere Kapitalerhöhung! - tatsächlich eine laufende Mine aufzubauen. Sobald es dannach aussieht und Gewinne erzielt werden, kommt natürlich Spiel in die Aktie. Dann wird auch der Goldpreis wieder wichtig. Im Moment betrifft er Tournigan ja nur indirekt. Dann aber geht es um konkrete Gewinne.

Ich habe diese Aktie gekauft, weil ich darauf spekuliere, dass Tournigan dann Erträge erzielt, die einen Aktiengegenwert deutlich über 1Euro bedeuten. Wer die Aktie hingegen gekauft hat, weil er dachte, es würden auf die Schnelle noch viele Käufer Folgen, kann jetzt natürlich verkaufen...

Innerhalb von 8 Monaten kann man woanders sicher mehr verdienen. Aber das dachtet Ihr bei Tournigan letzten Endes ja auch. Man kann innerhalb von acht Monaten auch einiges verlieren. Ich habe Zeit und sehe meine Knete hier ganz gut geparkt. Ist eine Alteranlage. Meinen nächsten Urlaub muss ich damit nicht finanzieren...

Jedem das Seine! Viel Erfolg!  

324 Postings, 7789 Tage KrabsPlayer2...

 
  
    #612
23.03.04 19:51
... Du hast ansonsten natürlich recht. Aber ich habe mit dem Gewechsel bisher wenig Erfolg gehabt. Wenn ich eine bessere Aktie sehe, steige ich evtl. auch kurzfristig um. Im Moment bin ich mir bei allen in Ariva hoch gehandelten Kurzfristrades aber alles andere als sicher. Wie gesagt: Tournigan war auch so ein Wert. Das lohnt sich dann nur bei sehr hohen Summen wo auch 10-20% schon etwas ausmachen. So viel investiere ich aber nicht in Einzelwerte. Wohl dem, der es sich leisten kann...  

1179 Postings, 7624 Tage rediNEWS!!! 25.03. Tournigan Gold

 
  
    #613
25.03.04 13:55
http://biz.yahoo.com/ccn/040325/...422407e57c33d5dcebbb8643522_1.html


Tournigan Adds Vice-President of Mining to Team
Thursday March 25, 6:31 am ET


VANCOUVER, BRITISH COLUMBIA--(CCNMatthews - Mar 25, 2004) -
Tournigan Gold Corporation welcomes Mr. James Walchuck to the management team as Vice President - Mining, effective immediately. Mr. Walchuck has most recently been the Manager Mining for Barrick at the Bulyanhulu Gold Mine in Tanzania. There he oversaw the building of a multi-million-ounce, high-grade underground mine in 24 months and achieved over 2 million man-hours without a lost-time accident. His direct experience in bringing gold mines into operation will be extremely useful as Tournigan moves both Curraghinalt and Kremnica properties into production.
Prior to his 6-year involvement with Bulyanhulu (first as Sr. Project Manager with Sutton Resources then as Manager Mining for Barrick), Mr. Walchuck was Manager of Mining and then Manager - Corporate Operations for Royal Oak Mines. This was preceded by a 5-year term as Chief Mining Engineer for Tarkwa Goldfields in Ghana. A member of the Professional Engineers of Ontario for 24 years, Mr. Walchuck holds Bachelor Degrees in both Science and Engineering.

Mr. Walchuck's substantial hands-on experience in underground mining techniques, combined with a successful track record in project management, budgeting and mine engineering is a perfect match for Tournigan's two gold projects.

Tournigan Gold is focused on developing two advanced gold projects in Europe - Curraghinalt in Northern Ireland and Kremnica in Slovakia. Feasibility drilling at Curraghinalt is nearing completion with the final feasibility study to be completed by the fourth quarter of 2004. Kremnica will be the focus of exploration and development work in 2004, with feasibility studies expected to be completed during the third quarter 2005.

TOURNIGAN GOLD CORPORATION

"Damien Reynolds"

Damien Reynolds, President and Director

Statements in this press release other than purely historical information, including statements relating to the Company's future plans and objectives or expected results, constitute forward-looking statements. Forward-looking statements are based on numerous assumptions and are subject to all of the risks and uncertainties inherent in the Company's business, including risks inherent in mineral exploration and development. As a result, actual results may vary materially from those described in the forward-looking statements.


--------------------------------------------------
Contact:

Tournigan Gold Corporation
Damien Reynolds
President
Phone: (604) 683-8320
or
Tournigan Gold Corporation
Garry Stock
Executive VP
Phone: (604) 683-8320

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.



--------------------------------------------------
Source: Tournigan Gold Corporation  

2966 Postings, 8420 Tage TamerBsieht sehr gut aus die News super

 
  
    #614
26.03.04 14:14
bin drin  

1179 Postings, 7624 Tage redibald kommen noch mehr News....

 
  
    #615
26.03.04 18:38
aber erstmal willkommen TamerB...obwohl du eigentlich schon lange dabei bist! :)  

2966 Postings, 8420 Tage TamerBbald geht es ab o. T.

 
  
    #616
29.03.04 09:53

527 Postings, 7621 Tage bergLöweNews!

 
  
    #617
31.03.04 09:18
European Gold abandons Tournigan action

2004-03-29 19:00 ET - Street Wire

See Street Wire (C-GAL) European Gold Resources Inc


by Stockwatch Business Reporter

European Gold has dropped its action against Tournigan Gold in a Supreme Court of British Columbia filing on March 15, 2004. The original suit was filed on Feb. 19, 2004, in which European Gold accused Tournigan of obstructing a $550,000 financing with Canaccord by way of a letter sent to Canaccord airing Tournigan's contention that Omagh was the subject of a title claim by Tournigan. Other financing opportunities for Omagh were also alleged to have been sabotaged by European Gold.

Tournigan's involvement with the Omagh project began in September, 2003, when it was granted a right from European Gold to earn 75 per cent in Omagh, only to be turned away a few months later in February. According to Tournigan, it still held title to the property as the original agreement was binding.

In Stockwatch news it was reported on March 3, 2004, that Tournigan decided to let go of any interest it held in the Omagh property, while European Gold would dismiss its claim against Tournigan.


 

79561 Postings, 9161 Tage Kickyhat Omagh Project dafür aufgegeben!

 
  
    #618
31.03.04 09:23
Vergleich:In Stockwatch news it was reported on March 3, 2004, that Tournigan decided to let go of any interest it held in the Omagh property, while European Gold would dismiss its claim against Tournigan.
 

9279 Postings, 7623 Tage HappydepotRe.bald geht die Post ab

 
  
    #619
31.03.04 09:50
auch bei denen 748750,575440,922032.  

527 Postings, 7621 Tage bergLöweNews könnten bald kommen...

 
  
    #620
31.03.04 17:44
Canaccord kauft heute alles weg in Kanada...schon 53k
 

527 Postings, 7621 Tage bergLöweOderbuch von w:o morchel

 
  
    #621
31.03.04 17:48

Bid im Orderbuch

33 Canaccord 50,000 0.48

36 Latimer 20,000 0.465

33 Canaccord 30,000 0.46

33 Canaccord 20,000 0.455

36 Latimer 5,000 0.45

27 Dundee 25,000 0.44

36 Latimer 5,000 0.44

46 First Associates 25,000 0.43

95 Wolverton 5,000 0.415

27 Dundee 29,000 0.415

und auf der Verkaufsseite war es auch schon mal voller!

0.49 5,000 36 Latimer

0.50 5,000 9 BMO

0.50 1,000 85 Scotia Capital

0.50 10,000 141 Bolder

0.50 5,000 81 HSBC

0.51 10,000 9 BMO

0.52 7,000 36 Latimer

0.52 25,000 27 Dundee

0.55 3,500 36 Latimer

0.55 10,000 2 RBC

KAUFEN

 

1179 Postings, 7624 Tage rediRichtung norden...sieht echt gut aus! o. T.

 
  
    #622
31.03.04 17:51
 

1179 Postings, 7624 Tage rediCanaccord kauft heute weiter ein!

 
  
    #623
01.04.04 16:36
Bid 0,50$ ( 40K) / ask 0,50$ ( 10K)...


0.50 Canadian Dollar = 0.31019 Euro  Kurs in DE bei 0,30€
 

1179 Postings, 7624 Tage rediJetzt wird in DE auch eingekauft...news

 
  
    #624
01.04.04 16:40
könnten d. Grund sein! Also schön abwarten!
Tournigan ist immer für ne Überraschung gut!  

1179 Postings, 7624 Tage redigleich gehts los....in Frankfurt wird schön

 
  
    #625
01.04.04 16:48

Seite: < 1 | ... | 22 | 23 | 24 |
| 26 | 27 | 28 | ... 35  >  
   Antwort einfügen - nach oben